Forwards Errata Sheet for Technical Rept 79-2,April-June 1978 Seismicity Near VC Summer Nuclear Station.
ML19261B291
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 01/13/1979
From: Crews E
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 7902150274
Download: ML19261B291 (2)


Text

.

v SOUTH CAROLINA ELECTRIC a GAS COMPANY post orricc son re.

CotuMelA, SOUTH CARollNA 29218 E. H. C R rw s, J n.

vici e. .so. v . o o.oo, c."""

Emormtr.imo ano Consrauenow February 13, 1979 Mr. Harold R. Denton, Director Offi:e of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Subj ect: Tirgil C. Summer Nuclear Station Docket No. 50-395 NRC Requests for Information

Dear Mr. Denton:

South Carolina Electric & Gas Company, acting for itself and as agent for South Carolina Public Service Authority, herewith forwards five (5) copies of an errata sheet fpr Te nical Report No. 79-2, " April - June 1978 Seismicity Near the V. C. Wmmer uclear Station".

er tr yours, E. H. Crews, Jr.

RBW:EHC:rh cc: H. T. Babb G. H. Fischer W. C. Mescher W. A. Williams, Jr.

W. S. Murphy T. B. Conner, Jr.

B. A. Bursey NPCF/Dixon File ffu2/4"oD7 ,

ERRATA FOR TECilNICAL REPORT 79-2 APRIL-JUNE 1978 SEISMICITY NEAR 'IllE V. C. SUMMER NUCLEAR STATION The following corrections and additions are to be made to TR 79-2.

Report Summary, paragraph 1, line 9 "3.8" should be changed to "2.8".

Page 8, tabic 5 The distance for K3 = .282 should be "R 2 4.8 km" instead of R 14.8 km.

Pag'e 20, paragraph 1, line 3 The following sentence should be added between " period" and " April".

"The number of unlocatable events observed at Site 1 during this report period increased dramatically, relative to previously observed rates, as a result of the doubling of the site gain (on 27 March 1978) and reduced traffic noise."

Page 20, paragraph 1, line 7 Place a "." after " events" and then insert the following text.

" Site 3 observed only about 95% of the events during April as it had during March. In May and June, borever, it only observed about 90% of the events. The high rate for Site 2 is unusual because it observed only 93% of the locatable events"

~

Page 26, figure 8 The linear recurrence curve and equation fit to the cumulative data should be added to the figure.

The equation is " log N c= 4.24 -1.40 DMAG".

TTELED(NE GEOTECH