ML19261A422

From kanterella
Jump to navigation Jump to search
Forwards Technical Rept,Reliability Study of Davis-Besse Unit 1 Decay Heat Removal Sys Suction Bypass. Concludes Facility Design & Procedures Meet Required Protection for Health & Safety of Public
Date released: 10/02/2019 Download: ML19261A422


Reliability Study of Davis-Besse Unit 1,Decay Heat Removal Sys Suction Bypass, Prepared by Bechtel Power Corp.Analyzes Incidents Re Decay Heat Removal Sys Exposure to Overpressure Due to Improper Opening of Suction Bypass
ML19261A425
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/05/1979
From:
TOLEDO EDISON CO.
To:
References
Download: ML19261A425 (35)
Forwards Technical Rept,Reliability Study of Davis-Besse Unit 1 Decay Heat Removal Sys Suction Bypass. Concludes Facility Design & Procedures Meet Required Protection for Health & Safety of Public
ML19261A421
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/1979
From: Roe L
TOLEDO EDISON CO.
To: REID R W
Office of Nuclear Reactor Regulation
References
Download: ML19261A421 (1)