TOLEDO
-.%=: EDISON LOVdLL E. roe Docket No. 50-346
... n. o..,,4 F4 r s (le. pal "
't 3 I (4*'I g License No. NPF-3 Serial No. 479 January 11, 1979 Director of Nuclear Reactor Regulation Attention:
Mr. Robert W.
Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors U.S. Nuclear Regulatory Commissi:;
Washington, D.C.
20555
Dear Mr. Reid:
Enclosed please find three copies of the technical report, " Reliability Study of Davis-Besse Unit No. 1 Decay Heat Removal System Suction Bypass",
dated January 5, 1979. This report is 'veing submitted in fulfillment of the requirements of license condition 2.C. (3)(p) of the Facility Operating License for Davis-Besse Nuclear Power Station Unit No. 1 (NPF-3).
With the implementation of the administrative 1y controlled unique key and lock system which will secure the bypass valves DH21 and DH23, we concluoe that the present facility design and procedures meet without question, the required protection for the health and safety of the public. This unique key and lock system will be implemented by the Applicant prior to start up following the first regularly scheduled refueling outage. With this commitment we consider that the requirements of license condition 2.C. (3)(p) have been met.
Yours very truly, 3
THIS DOCUMENT CONTAINS P00R QUAUTY PAGES LER:CRD:FRM
Enclosure:
Technical Report - Reliability Study of Davis-Besse Unit No. 1 Decay Heat Removal System Suction Bypass Dated January 5, 1979 mj d/7
^)
THE TOLEOO EDISONfGMPANY EOISON PLAZA 300 MADISON AVENUE TOLEDO CHIO 43652 79011801d p