Interim Deficiency Rept Re Possible Future Movement of Radwaste Bldg Geologic Feature.Possible Movement & Predicted Amount Being Studied by Geologic Monitoring.Interim Rept Will Be Provided by 800731
ML19260E254
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/05/1980
From: Rhode G
NIAGARA MOHAWK POWER CORP.
To:
References
NUDOCS 8002140316
Download: ML19260E254 (2)


Text

9

~

l'ACARA FAOHAV/K FOi'En C0!iFOR ATION/223 ER.E COULEVAhD WEST. 3YRACUSE. N Y.13202/ TELEPHONE (215) 4741511 February 5, 1960 Office of Inspecticn and Enforcement Region 1 actn: Mr. n. i. Catisui, C; .lc r Recctor Ccnstruction and Engineering Support Branch Nuclear Regulatory Commission 631 Park Avenue Kir; of Prussia, PA 19406

Dear Mr. Carlson:

Re: Nine Mile Point Unit 2 Docket No. 50-410 On December 4, 1979, Niagara Mohawk Power Corporation notified Mr. A. C.

Cerne of your staff by telephone of a potential deficiency at the Nine Mile Point Unit 2 construction site. This condition ccncerned the possible future movement of the Radwaste Building geclogic feature.

Our January 7,1980 letter proviced the results of the preliminary analysis of the Radwaste Euilding geologic feature. This analysis indicated that there is insufficient information available to determine if potential rock adjustments in the vicinity of plant structures is reportable in accordance with the strict interpretation of 10CFR50.55(e).

However, to assure coripliarce with your interpretation of the regulation, Niagara Mohawk nereby notifies tne Nuclear Regulatory Commission that the potential future rock adjustments near plant structures is considered as reportable in accordance with 10CFR50.55(e). This includes the potential for both small vertical ano horizontal rock adjustments. The questions of possible movement and the predicted amcunt are being further studied by continuing review, field investigation and geologic monitoring.

b/7 ss go od 4" /b

Mr. R. T. Carlson 2- Fecwary 5,1980 In accordance with Paragraph 50.55(e) (3) of 10CFR50, cn interim rcport will be provided by July 31. 1980, wnich will discuss the status of these investigations.

Very truly yours, NIAGARA MOHAWK POWER CORFORATION 7,

,  ! , '/

I-f 3

-f ec:c./'.' ) / Q ter Gerald K. Rhdde Vice President System Project Management