ML19260E111

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-38,50-270/79-35 & 50-287/79-38 on 791205-07.No Noncompliance Noted
ML19260E111
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/09/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19260E107 List:
References
NUDOCS 8002130379
Download: ML19260E111 (2)


See also: IR 05000269/1979038

Text

-

.

.

/c,

  • 4

I

d

o,,

UNITED STATES

~

8

') ,

NUCLEAR REGULATORY COMMISSION

o

[E

$

^

REGION ll

101 MARIETTA ST., N.W.. SUITE 3100

o,

%

g'

ATLANTA, GEORGIA 30303

JAN 0 91980

In Reply Refer To:

RII:PTB

50-269/79-38

50-270/79-35

50-287/79-38

.

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vi e President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by P. T. Burnett of this office on

December 5-7, 1979 of activities authorized by NRC License Nos. DPR-38, DPR-47

and DPR-55 for the Oconee Nuclear Plant facility, and to the discussion of our

findings held with J. Ed Smith at the conclusion of 'he inspection.

Areas examined during the inspection and our findir ;s are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

800213023'/1

-

.

.

.

JAN 0 91980

.

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

t

z'd1C

D

/

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Suport Branch

fuelosures:

Inspection Report Nos. 50-269/79-38,

50-270/,'9-35 and 50-287/79-38

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box I;73

Seneca, SC 29678

'.

,

O