Forwards IE Insp Repts 50-321/79-34 & 50-366/79-38 on 791029-1102 & Notice of Violation
ML19260D317
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/21/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19260D307 List:
References
NUDOCS 8002080311
Download: ML19260D317 (2)


See also: IR 05000321/1979034

Text

.

.

a

\\

/

'o

UNITED "ATES

l'

1

NUCLEAR REGULc rORY COMMISSION

$

oE

REGION 11

'#

o

101 MARIETTA ST., N.W., SulTE 3100

e

AT LANTA, GEORGIA 30303

.....

In Reply Refer To:

NOV 2119/9

RII:CMH

50-321/79-34

50-366/79-38

Georg1a Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by C. M. Hosey of this office on

October 29 - November 2, 1979, of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion

a

of our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative record , interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this ofrice, within 20

days of your receipt of this notice, a written statement or explanation in reply

ir-luding:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such inforcation from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

1938 310

3)f

3oo2080

T

.

NOV 211979

Georgia Power Company

-2-

-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

l

.

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/79-34

and 50-366/79-38

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Manager-Nuclear Operations

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303

1938