a
\\
/
'o
UNITED "ATES
l'
1
NUCLEAR REGULc rORY COMMISSION
$
oE
REGION 11
'#
o
101 MARIETTA ST., N.W., SulTE 3100
e
AT LANTA, GEORGIA 30303
.....
In Reply Refer To:
NOV 2119/9
RII:CMH
50-321/79-34
50-366/79-38
Georg1a Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by C. M. Hosey of this office on
October 29 - November 2, 1979, of activities authorized by NRC Operating License
No. DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion
a
of our findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative record , interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this ofrice, within 20
days of your receipt of this notice, a written statement or explanation in reply
ir-luding:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncom-
pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such inforcation from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1938 310
3)f
3oo2080
T
.
NOV 211979
Georgia Power Company
-2-
-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
l
.
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/79-34
and 50-366/79-38
cc w/ encl:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor
P. O. Box 442
Baxley, GA 31513
W. A. Widner
Manager-Nuclear Operations
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
1938