ML19260D253
| ML19260D253 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/23/1980 |
| From: | Reid R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19260D254 | List: |
| References | |
| TAC-12656, NUDOCS 8002080195 | |
| Download: ML19260D253 (7) | |
Text
((
UNITED STATES NUCLEAR REGULATORY COMMISSION 2
e a
f, wAss NGTON. D. C. 20555
- s.....f FLORIDA POWER CORPORATION CITY OF ALACHUA CITY OF BUSHNEi.L CITY OF GAINESVILLE CITY OF KISSIMMEE CITY OF LEESBURG CIYY OF NEW SMYRNA BEACH AND UTILITIES COMMISSION, CITY OF NEW SMYRNA._ BEACH CITY OF OCALA ORLANDO UTILITIES COMMISSION AND CITY OF ORLANDO SEBRING UTILITIES COMMISSION SEMIN0LE ELECTRIC COOPERATIVE, INC.
CITY OF TALLAHASSEE DOCKET NO. 50-302 CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT
' AMENDME"T TO FACILIT OPERATING LICENSE Amendment No.27 License No. DPR-72 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Florida Power Corporation, et al (the licensees) dated January 11, 1980, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; '
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Cornission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8002080 i
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-72 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 27, are hereby incorporated in the license.
Florida Power Corporation shall operate the facility in accordance with the Technical S,pecifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION O /
il2]'s
-f-4" 6 rs Rooert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors,
Attachment:
Changes to the Technical Specifications Date of Issuance: January 23, 1980
ATTACHMENT TO LICENSE AMENDMENT NO. 2 7 FACILITY OPERATING LICENSE N0. DPR-72 DOCKET N0. 50-302 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
The corresponding overleaf pages are also provided to maintain document completeness.
Paaes 3/4 6-17 3/4 6-21 eM i
'7
TABLE 3.6-1 CONTAINMEIC ISOLATION VALVES VALVE NUMBER FUNCT 3 ISOLATION TIME (seconds)
A.
CONTAINMENT ISOLATION 1.
BSV-27 check #
iso, dur. nor. operation NA ESV-3 #
and open dur. RB spray 60 BSV-26 check e NA BSV-4 #
60 2.
CAV-126 iso. CA sys. fr. RC letdn.
60 CAV-l**
iso. CA sys. fr. pzr.
60 CAV-3 60 CAV-2 iso. CA sys.
60 CA'!-4 i 3-13te liquid sampling 60 4
CAV-6 d system 60 CAV-5 #
60 CAV-7
- 60 3.
CFV-20 check iso. N supply fr. CFTelA NA 2
CFV-28 60 CFV-17 check iso. N supply fr. CFT41B NA 2
CFV-27 60 CFV-18 check iso. MU systen fr. CFT-1B NA CFV-26 60 CFV-19 check iso. MU system fr. CFT-1A NA CFV-25 60 CFV-42 iso. liquid sampling fr.
60 CF system CFV-15 iso. WP sys. fr. CF tanks 60 CFV-16 60 CFV-29 60 CFV-11 iso. CF tanks fr. liquid 60 CFV-12 sampling system 60 4.
CIV-41 iso. CI sys. fr. RB 60 CIV-40 60 CIV-34 60 CIV-35 60 CRYSTAL RIVER - UNIT 3 3/4 6-17 Amendment No. 2 7
~..
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 5.
DHV-93 check iso. DH system fr. pzr.
NA CHV-91 60 DHV-43 #
iso. DH sys. fr. RB sump 120 GHV-42 #
120 DHV-4# & 41#
iso. DH sys. fr. RC 120 DHV-6 #
iso. DH system from 60 DHV-5 #
Reactor Vessel 60 6.
DWV-162 check iso. system NA DWV-160 60 7.
FY! aa check 4 iso. feedwater NA FWV-45 check #
from RCSG-1A NA FWV-43 check #
ice. Teedwater NA FWV-45 check #
from RCSG-1B NA 8.
MSV-130 #
from RCSG-1A 60 MSV-148 #
from RCSG-1B 60 MSV-411 #
iso main steam lines 60 from RCSG-1A MSV-412 #
iso, main steam lines 60 from RCSG-1A MSV-413 #
iso main steam lines 60 from RCSG-1B MSV-414 #
iso. main steam lines 60 from RCSG-1B 9.
MUV-40 iso. MU system from RC 60 MUV-41 60 MUV-49 60 MUV-253 60 MUV-261 iso. MU system from 60 MUV-260 control bleed-off 60 MUV-259 60 MUV-258 60
' /STAL RIVER - UNIT 3 3/4 6-18
TABLE 3.6-1 (Continued)
CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (seconds) 5.
SFV-18 iso. SF system NA SFV-19 NA SFV-119#
iso. Fuel Transfer tubes NA SFV-120#
from F.T. Canal NA 7.
WSV-1 containment monitoring NA WSV-2 system from RB NA D.
PENETRATIONS REQUIRING TYPE B TESTS Blind Flange 119 iso. RB NA Blind Flange 120 NA Blind Flange 116 NA Blind Flange 202 NA Blind Flange 348 iso. fuel transfer tube from NA Blind Flange 436 Transfer Canal NA Equipnent Hatch iro. RB NA Personnel Hatch iso. RB NA
- Not subject to Type C Leakage Test
- The provisions of Specification 3.0.4 are not applicable until startup for Cycle 3 operation.
Isolation valves closed to satisfy the require-ments of Specification 3.6.3.1 ACTION b. and c. may be re-opened on an intermittent basis under administrative control for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period as necossary for sampling.
CRYSTAL RIVER - UN:T 3 3/4 6-21 Amendment No. 2 7
CONTAINMENT SYSTEMS 3/4.6 4 COMBUSTIBLE GAS CONTROL HYDROGEN ANALYZERS LIMITING CONDITION FOR OPERATION 3.6.4.1 A containment hydrogen analyzer and a gas chromatograph shall be OPERABLE.
APPLICABILITY: MODES 1 and 2.
ACTION:
With one hydrogen analysis device inoperable, restore the inoperable device to OPERABLE status within 30 days or be in at least H0T STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analysis device shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gases containing:
a.
One volume percent hydrogen, balance nitrogen, and b.
Four volume percent hydrogen, balance nitrogen.
CRYSTAL RIVER - UNIT 3 3/4 6-22
.