Forwards IE Insp Rept 50-346/79-29 on 791101-02,05-10,12-16 & 19-30 & Notice of Violation
ML19260D068
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/04/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19260D069 List:
References
NUDOCS 8002070335
Download: ML19260D068 (2)


See also: IR 05000346/1979029

Text

'

/

'o

UNITED STATES

,h

~,j

NUCLEAR REGULATORY COMMISSION

!

)

(

r

REGION 111

e

0,,

,8,

799 ROOSEVELT ROAD

6

b

% .'.\\/

o

GLEN ELLYN,lLLINOIS 60137

...

.~4

gg

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Energy Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of this office

on November 2, 3, 5-10, 12-16, 19-30, 1979, of octivities at the Davis

Besse Nuclear Power Station, Unit 1, authorized by NRC Operating License

No. NPF-3 and to the discussion of our findings with T. Murray throughout

the month and at the conclusion of the inspection on November 30. 1979.

The enc 1c..ed copy of our inspection report identifies areas examined

during the inspection.

Within these creas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within twenty days of

your receipt of this notice a written statement or explanation in reply,

including for each item of noncompliance: (1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to with-

.

hold such information from public disclosure.

The application must in-

M34 277

..

8 0 02 070 3M

.

Toledo Edison Compaay

-2-

JEf 4

1980

.

clude a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

d

R. F. Heishman, Chief

Reactor Operations and

i

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-346/79-29

cc w/encls:

Mr. T. D. Murray, Station

Supertindent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio Power

Siting Commission

Helen W. Evans, Director

Division of Power

Generation

1934

278

.

.

..

-