e

.

6

o

UNITED STATES

g

!

NUCLEAR REGULATORY COMMISSION

o

.

$

'

E

REGION ll

b[

0,

101 MARIETTA ST,. N.W., SulTE 3100

%

o

ATLANTA, GEORGIA 30303

In Reply Refer To:

RII:DKW

50-395/79-39

South Carolina Electric and Gas Company

ATTN:

M. C. Johnson, Vice President

Special Services and Purchasing

P. O. Box 764

Columbia, SC 29'18

Gentlemen:

This refers to the inspection conducted by D. K. Walters of this office on

November 27-30, 1979 of activities authorized by NRC Construction Permit No.

CPPR-94 for the Summer Nuclear Station facility, and to the discussion of our

findings held with J. F. Algar at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regacd to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

app}ication must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

dBf

4

1937

067

f

,'C.

E.

urphy, dief

Reactor Construction and

Engineering Support Branch

Enclosure:

(See Page 2)

8002070

g9

..

.

South Carolina Electric and

DEC 2 41979

Gas Company

-2-

.

Enclosure:

Inspection Report No. 50-395/79-39

cc w/ enc 1:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, DC 20006

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, SC 2J065

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, SC 29065

-

.

1937

068