d
'o
UNITED STATES
Q -397
g
8
NUCLEAR REGULATORY COMMISSION
_gg
g
g
.
,e
REGION 11
,
.
1 !-
o,
.
101 MARIETTA ST., N.W., SUITE 3100
%U
ATLANTA, G EORGIA 30303
- se**
In Reply Refer To:
RII:ALC
50-327/79-65
DEC 101979
50-328/79-33
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by A. L. Cunningham of this office on
November 19-20, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the discussion
of our fi'ndings held with R.11. Shell at the conclusion of the inspection.
'
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
\\
/J
-
. T.
utherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosure:
See Page 2
1937 02
8002070
-
DEC 1019id
Tennessee Valley Authority
-2-
-
Enclosure:
Inspection Report Nos. 50-327/79-65
and 50-328/79-33
cc w/ encl:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. 'collentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
D. L. Lambert, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
E. G. Beasley
Tennessee Valley Authority
309 Grant's Euilding
Knoxville, Tunnessee 37902
-