ML19260C949

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-65 & 50-328/79-33 on 791119-20.No Noncompliance Noted
ML19260C949
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/10/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19260C950 List:
References
NUDOCS 8002070169
Download: ML19260C949 (2)


See also: IR 05000327/1979065

Text

d

'o

UNITED STATES

Q -397

g

8

NUCLEAR REGULATORY COMMISSION

_gg

g

g

.

,e

REGION 11

,

.

1 !-

o,

.

101 MARIETTA ST., N.W., SUITE 3100

%U

ATLANTA, G EORGIA 30303

  • se**

In Reply Refer To:

RII:ALC

50-327/79-65

DEC 101979

50-328/79-33

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

November 19-20, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant facility, and to the discussion

of our fi'ndings held with R.11. Shell at the conclusion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

\\

/J

-

. T.

utherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

See Page 2

1937 02

MT

8002070

-

DEC 1019id

Tennessee Valley Authority

-2-

-

Enclosure:

Inspection Report Nos. 50-327/79-65

and 50-328/79-33

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. 'collentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

Tennessee Valley Authority

309 Grant's Euilding

Knoxville, Tunnessee 37902

-

1937

033