ML19260C205

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-0820/79-19 on 790910-14.No Noncompliance Noted
ML19260C205
Person / Time
Site: Wood River Junction
Issue date: 11/06/1979
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bowers C
UNC RECOVERY SYSTEMS, UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
Shared Package
ML19260C206 List:
References
NUDOCS 7912260059
Download: ML19260C205 (1)


Text

74 V +A

, ',o UNITED STATES

g ) yq [ g NUCLEAR REGULATORY COMMISSION g

REGION I 6 NOV 1979

% $' * ' [/

  • j 631 PARK AVENUE
  • ,,'D g

KING OF PRUSSIA, PENNSYLVANIA 19406

  1. 4

,o 9 '

Docketlio*.*70-820 United Nuclear Corporation ATTN:

Mr. C. E. Bowers Gener" Manager UNC Recoiery Systens Wood River Junction, Rhode 1 2nd 02894 Gentlemen

Subject:

Inspection '

/0-820/79-19 This refers to the inspection conducted by I. Cohen of this office on September 10-14, 1979, of activities authorized by NRC License No. SNM-777 and to the discussions of our findings held by I. Cohen with R. Gregg of your staff at the conclusion of the inspection.

Areas exanined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of your control and account-ing procedures for safeguarding special nuclear materials and.your facility security procedures are exempt from disclosure; th'erefore,;th'd_ enclosed inspec ~

tion report will not be placed in the Public Document Room and will-receive limited distribution.

No reply to this letter is required; however, should you have any questions con-cerning this inspection, we will be pleased to discuss them with you.

Sincerely, s

kV/

lter G. Mar in, Chief Safeguards Branch

Enclosure:

Office of Inspection and Enforcement Inspection Report No. 70-820/79-19 (Contains 2.790 Information) jfjf Q cc:

R. J. Gregg, Manager, Quality Assurance D. M. Schultz, Manager, Compliance 7912 % tl0 j