ML19260C211
| ML19260C211 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 10/25/1979 |
| From: | Cohen I, Gody A, Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19260C206 | List: |
| References | |
| 70-0820-79-19, 70-820-79-19, NUDOCS 7912260063 | |
| Download: ML19260C211 (1) | |
Text
l U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.
70-820/79-19 Docket No.70-82C License No.
SNM-777 Safeguards Group 1
Licensee:
18.ited Nuclear Corporation Wood River Junction, Rhode Island 02894 Facility Name:
UNC Recovery Systems Inspection At:
Wood River Junction, Rhode Island Inspection Conducted:
September 10-14, 1979 Date of Last Material Control and Accounting Inspection:
September 7, 1979 Type of Inspection:
Unappounced Material Control & Accounting 10- l 9-7 9 Inspectors:
hemist date
- 1. Cohen, e7 h
/O /E5 /7c7 T. God 9, Chemic dath date
/o-z.5-79 Approved by:
/
J. H. Joyner, Chfe,f, Nuclear Material Control date Support SectiM, Safeguards Branch Inspection Summary:
Areas Inspected:
Facility Organization and Facility Operation The inspection involved 58 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
Results:
The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.
1616 039 Region I Form 166 (August 1979) 7912260 O63