LER 79-046/01T-0:on 791127,while Generator Which Provides Emergency Power to Motor Operated Valve CH-115D Was Removed from Svc,Valve Was Placed on Clearance in Closed Position for Maint.Caused by Operator Error
ML19260C156
Person / Time
Site: Beaver Valley
Issue date: 12/11/1979
From: Werling J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19260C150 List:
References
LER-79-046-01T, LER-79-46-1T, NUDOCS 7912180639
Download: ML19260C156 (2)


Text

NRC FOPPS 266 U.S. NUCLE AR RECULATORY COMMISSION (7 7N I

~

, LICENSEE EVENT REPORT CONTROL BLOCK: l i

l l l l l e

Ih (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

@ l 8P9 l A lUCENSEE 7

B l VCOCE l S l 1 l@l 14 IS 0 l 0 l- l 0LICENSE l0 l 0 l 0 l 0 l- l0 l 0 NUMSER 25 l@l4 26 l1 l1 l1 LICENSE l1Jol@lS t CAl T Sdl@

TYPg CON'T '

7 7

o i 8

,"a ,"c lL}@l0l5lol010l3l3l4 @l1lll 2l 7l 7 60 61 COCKET NVY8 ER 68 63 EVENT DATE 9@l1 74 75 l 2 T' 'OR1 TlO117 AT E l 980l@

EVENT DESCRIPTION ANO PROBABLE CONSEQUENCES h o 2 At 0637 hours0.00737 days <br />0.177 hours <br />0.00105 weeks <br />2.423785e-4 months <br />, the No. 1 Emergency Diesel Generator was removed from service for I f5 TTI I preventive maintenance. The generator provides emergency power to cH-115B, one of I o , ltwo parallel motor-operated valves on the suction line from the Refueling Water l o s 1 Storage Tank to the HHSI pumps. At approximately 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, the redundant MOV, l lo'isIlCH-115D, was placed on clearance in the closed position to correct a motor operator 1 o 7 [ problem. The error was discovered at 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br />. The valve was restored at 1029 I o a Ihours providing the required flow path. I 7 8 9 80

$YSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUSCODE COMPONENT CODE SUSCOCE SUSCODE 7

O 9 8

l Sl Fl@ l Al@ l Al@ lV l Al Ll Vl El Xl@ W@ W @

il 10 14 12 13 18 19 20

. SE QUE NTI AL OCCURRENCE REPORT REVISION LE R/RO EVENTYEAR REPORT NO. CODE TYPE NO.

@ ,RE l7 9l l-l l0l4l6[ l/l l0l1l lTl l-l l0 l

_ 21 22 23 24 26 27 28 23 JJ 31 32 TK N AC CN CNP NT 1E HOURS 5C ITT O FOR 8. $ PPL E MANUFA TURER lH 33 l@lG 34 l@ lZl@

35 lZl@

36 l0l0l0l0l 31 40 W@

41 l42 Ni@ l43 Zl@ lZl9l9l9l@

44 47 CAUSE DESCRIPTION ANO CCARECTIVE ACTICNS h i o lThe flow path to tha HHST pums wnitid have heon ,",il,hin with offsite power I

[TTi 1 lavailable. In the event of coincident HHSI and loss of of fsite power, HHST wotild g lonly have been available until the volume control tank emotied. The inciden't was I g Icaused when clearance approval was granted in the midst of normal early morning I m 1 demands on operator time. I 7 8 9 80

$A 5  % PCWER CTHER STATUS ISCO RY OtSCOVERY DESCRIPTION i s l' E l@ l 0l 3l 5l@l N/A l Al@l Operator observation l ACTtylTY CO TENT REI.E ASED CP ret.E ASE AMOUNT CF ACTIVITY LOCATION OF RELEASE i 6

@ l N/A l l N/A l 7 8 9 to 11 44 45 80 PERSONNEL EXPCSURES NUMBER TYPE C ESCRIPTION

  • i 7 10l0l0l@lZl@l

N/A l

,ERsON~E L ,N;u'4 Es NUMBER OESCR,PTICN i 9 l0l0l0l@! N/A _ l Os, OP OR 0 TYPE AC A ,.Ciu C E SCRIPTION TY l614 33U '

[TTT1 i Z l@l N/A l I? SUED PU S U TY 79121806.37 NRc Use Cstv

  • ITTT1 1 N I@DESCRifTION l N/A llll1llll l -l i l }

7 8 3 10 68 63 80. S NAME OF PREPARER

. . edM PHCNE:

412-643-1258 , 2,

o y Y Attachment To LER 79-46/OlT Beaver Valley Power Station Duquesne Light Company Docket No. 50-334 The flow path from the refueling water storage tank to the' high head safety

' injection pumps is via a path controlled by parallel motor-operated isolation valves which are normally closed. At 0637 hours0.00737 days <br />0.177 hours <br />0.00105 weeks <br />2.423785e-4 months <br /> on November 27, the No. 1 Emergency Diesel Generator was removed from service for scheduled preventive maintenance. The generator provides emergency power to [CH-ll5B], one of the two parallel motor-operated isolation valves on the RWST. At about 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br />, the redundant motor-operated isolation valve [CH-ll5D] was placed on clearance, in the closed position, to correct a motor-operator malfunction.

The flow path to the charging pumps would have been available with offsite power available. In the event of a simultaneous requirement for high head safety injection and a loss of of fsite power, high head injection would only have been available until the Volume Control Tank emptied. The incident was caused when clearance approval was granted in the midst of normal early morning demands on operator time.

The error was discovered by the licensed operator upon reflection on earlier morning activities at 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br />. The valve was opened at 1029 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.915345e-4 months <br /> providing the required flow path to the safety injection pumps.

The Onsite Safety Committee has reviewed the incident and has determined to adopt and implement administrative procedures to perform redundant independent verificatirn of the opetrbility of the remaining ESF equipment whenever any safety system or subpart is intenti'onally removed from service.

A detailed review of existing proceduras and controls shall be performed to assure that the limiting conditions for operation are not defeated by maintenance or other activities.

1614 331 4