Approves Containing Design Mods for Fire Protection Sys,In Response to 780303 Safety Evaluation. Review Status Encl
ML19260C033
Person / Time
Site: Oyster Creek
Issue date: 11/16/1979
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7912180259
Download: ML19260C033 (3)


Text

%

    • "4,(o 4

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION 3

s, g

E WASHINGTON. D. C. 20555 o

s.,

/

NOV I 61979 MEMORANDUM FOR:

D. Ziemann, Chief, Operating Reactors Branch #2, 00R FROM:

G. Lainas, Chief, Plant Systems Branch, D0R

SUBJECT:

REVIEW 0F FIRE PROTECTION MODIFICATIONS - OYSTER CREEK (TAC 11104)

Plant Name: Oyster Creek Nuclear Generating Station Licensee; Jersey Central Power and Light Company Docket No.:

50-219 Project Manager:

S. Nowicki Review Status: See attached status sheet By letter dated August 31, 1979, Jersey Central Power and Light Company (JCP&L) provided the design criteria requested by our SER of March 3,1978 for certain modifications resulting from the fire protection review. We have reviewed this information, with the assistance of a Fire Protection Engineer from DSS, and find that the designs that have been proposed for implementing these modifications will provide the protection the staff intended in its preparation of the SER and, therefore, are acceptable.

l'

^)

k A f.l y ^ m

/w G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

Enclosure:

Status Sheet

Contact:

H. George X-27136 cc w/ enclosure:

1613 232 See page 2 3 12180 g 57

W

_2_

cc w/ enclosure:

D. Eisenhut R. Tedesco R. Vollmer V. Moore V. Benaroya G. Lainas R. Ferguson T. Wambach S. Nowicki G. Harrison H. George 1613 233

w STATUS OYSTER CREEK FIRE PROTECTION REVIEW Design Basis Review Status 3.1.4 Fire Detectors Complete 3.1.5 Halon Suppression Systems Complete 3.1.6 Water Spray Systems Complete 3.1. 7 Sprinkler Systems Complete 3.1.16 Ventilation System Changes Complete 3.1.20 Alternate Water Supply Complete 3.1.21 Protection From Water Damage Compl ete 3.1.22 New Battery Complete 3.1.23 Remote Shutdown Station Delayed for SEP Incomplete Item Review 3.2.1 Administrative Controls 3.2.2 Radwaste Fires 3.2.3 Fire Barrier Penetrations 3.2.4 Communications Equipment 3.2.5 Fire Hazards Analysis Update

    • (delayed for SEP)
  • - Information received 4/7/78; 8/1/78; 9/22/78; and 8/31/79; SER Supplement being drafted with target completion of 12/31/79.

- Tc be provided 60 days following comp'letion of all modifications.