Forwards IE Circular 79-24, Proper Installation & Calibr of Core Spray Pipe Break Detection Equipment on Bwrs. No Written Response Required
ML19260B592
Person / Time
Site: Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle  Constellation icon.png
Issue date: 11/26/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 7912100417
Download: ML19260B592 (1)


Text

e o ara

/

UNITED STATES 8'

NUCLEAR REGULATORY COMMISSION

,q 5-s REGION 111 e'f 799 ROOSEVELT ROAD o,

\\ * "%v GLEN ELLYN. lLLINois 60137 NOV 2 C 1979 Docket Nos. 50-10, 50-237, 50-249, 50-254, 50-265, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, 50-456 and 50-457 Commonwealth Edison Company ATTN:

Mr. Cordell Reed Manager of Nuclear Operations Post Office Box 767 Chicago, IL 60690 Gentlemen:

The enclosed IE Circular No. 79-24 is forwarded to you for information.

No written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely,

%w h /

& James G. Keppler Director

Enclosures:

1.

IE Circular No. 79-24 2.

Recently Issued IE Circulars cc w/encls:

Mr. D. L. Peoples, Director Mr. Gunner Sorensen, Site of Nuclear Licensing Project Superintendent Mr. B. B. Stephenson, Mr. R. Cosaro, Project Station Superintendent Superintendent Mr. N. Kalivianakis, Central Files Station Superintendent Director, NRR/DPM Mr. N. Wandke, Station Director, NRR/ DOR Superintendent PDR Mr. L. J. Burke, Site Local PDR Project Superintendent NSIC Mr. T. E. Quaka, Quality TIC Assurance Supervisor Anthony Roisman, Esq., Attorney Mr. R. H. Holyoak, Station Mr. Dean Hansell, Office of Superintendent Assistant Attorney General 7912100

4 Accession No: 7910250492 SSINS No. 6830 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 November 26, 1979 IE Circular No. 79-24 PROPER INSTALLATION AND CALIBRATION OF CORE SPRAY PIPE BREAK DETECTION EQUIPMENT ON BWRs Description of Circumstances:

During 1976 the Iowa Electric Light and Power Company identified and corrected a potential problem involving the core spray (CS) pipe break detection system at the Duane Arnold Energy Center (DAEC). The problem relates to the setpoint, fur.-tion, and installation of the differential pressure (dp) instrument which monitors for a CS pipe break that is located in the annulus a ea of the reactor vessel (i.e., located outside the core shroud but inside the reactor vessel).

The installed instrument, range of 0 - 24 psid, was found deflecting downscale (i.e., reading negative psid) during operation.

The licensee's investigation of the downscale deflection revealed that the original piping arrangement and calibration did not adequately take into account the effect of density changes of the water in the pressure leg connection The original installation had the high pressure side of the dp instrument (see attached Figure 1) connected to the reference leg in the vessel (Figure 1 Connection X) and the low pressure side to the core spray piping outside the vessel but inside the drywell (Figure 1 Connection Y).

With the piping intact, this arrangement senses the pressure difference between bottom and top of core. With a break in CS piping in the annulus area the instrument then senses the additional pressure drop across the separators (dp q 7 psi dditional) and dryers (dp q 7-inches water).

This installation was in accordance with GE desigr requirements.

Also in accordance with GE instructions the calibration of the dp instrument was performed with the reactor in the cold condition and the alarm was set to trip at 5 psid increasing.

Because of this cold calibration the dp instrument then indicated full downscale negative during operation.

This negative dp was due to the heat up of the reference leg (Figure 1 Connection X) which caused the flui density to decrease as the plant reached hot conditions.

The magnitude of this c was determined to be about 3.5 psid following completion of the modification discussed below.

DUPLICATE DOCUMENT Entire document previously entered into system under:

b ANO 1521 192 7-No. of pages:

EW