Forwards IE Info Notice 79-28, Overloading of Structural Elements Due to Pipe Support Loads. No Response Required
ML19260B426
Person / Time
Site: Yankee Rowe
Issue date: 11/16/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 7912100157
Download: ML19260B426 (1)


Text

Yk gs,' *

  • coq y_

fo, UNITED STATES 3 J,1

,g NUCLEAR REGULATORY COMMISSION y ) 3 c. (

.C REGION I 8

631 PARK AVENUE o,, t'[', [f'

%,'sv KING oF PRUSSIA, PENNSYLVANIA 19406 Docket No. 50-29 NOV 161979 Yankee Atomic Electric Company ATTN:

Mr. Robert H. Groce Licensing Engineer 20 Turnpike Road Westborough, Massachusetts 01581 Gentlemen:

The enclosed IE Information Notice No. 79-28 provides information on the over-loading of structural elements due to pipe support loads.

If you have any questions regarding this matter, please cantact this office.

Sincerely, into///.

is c k

Boyce H. Grier

/LDirector

Enclosures:

1.

IE Information Notice No. 79-28 2.

List of Recently Issued Information Notices CONTACT:

L. E. Tripp (215-337-5282) cc w/encls:

H. Autio, Plant Superintendent L. E. Minnick, President 1518 034

< 31210 o 151

ENCLOSURE 1 SSINS No.:

6870 79102504k5 Accession No.:

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Infonnation Notice No. 79-28 Date:

November 16, 1979 Page 1 of 1 OVERLOADING 0F STRUCTURAL ELEMENTS DUE TO PIPE SUPPORT LOADS Description of Circumstances:

Recently, the NRC wcs informed that', in the course of the inspections pursuant to IE Bulletin No. 79-02 and 79-14 by the Portland General Electric Co. (PGE) at the Trojan Nuclear Plant, some walls were found which did not have adequate structural strength to sustain the required support reactions.

Bechtel Corporation was the Architect Engineer for the plant.

Thcse structural inadequacies were reported to be attributable to two deficiencies:

1)

Apparent lack of a final check of certain pipe support locations and reactions to ensure that the supporting structural elements possessed adequate structural integrity to sustair the required loads.

2)

Inadequate design criteria for tre reactions from supports anchored into the face of concrete block walls;

?.g., relying on the combined strength of double concrete block walls witt out positive connection between the two walls by means other than the bond provided by a layer of grout between them.

The NRC is currently pursuing the;6 issues in detail for the Trojan Nuclear Plant to determine the extent of chese deficiencies and the generic implications for other Bechtel facilities.

This Information Notice is provided as an early notification of a possible significant matter.

It is expected that recipients will review the infcrmation for possible applicability to their facilities and the actions being perfonned under IE Bulletin No. 79-02.

Specific action is being requested relating to the adequacy of attachments to concrete block walls under IE Bulletin No. 79-02, Revision 2, item 5.c.

No specific actions are requested in response to this Information Notice. If NRC evaluations so indicate, further licensee actions may be requested or required.

If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

1518 035 No written response to this IE Information Notice is required.

ENCLOSURE 2 IE Information Notice No. 79-28 Date:

November 16, 1979 Page 1 of 1 RECENTLY ISSUED IE INFORMATION NOTICES Information Subject Date Issued to Notice No.

Issued 79-19 Pipe Cracks in Stagnant 7/17/79 All power reactor Borated Water Systems at facilities with an PWR Plants OL or CP 79-20 NRC Enforcement Policy -

8/14/79 All Holders of Reactor NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 Same Title as 79-20 9/7/79 Same as 79-20 (Revision No. 1) 79-21 Transportation and Com-9/7/79 All power and research mercial Burial of Radio-reactors with OLs active Material 79-22 Qualification of Control 9/14/79 All power reactor faci-Systems lities with an OL or CP 79-23 Emergency Diesel Generator 9/26/79 All power reactor faci-Lube Oil Coolers lities w*th an OL or CP 79-24 Overpressurization of Con-10/1/79 All power reactor faci-tainment of a PWR Plant lities with an OL or CP After a Main Steam Line Break 79-25 Reactor Trips at Turkey 10/1/79 All Power Reactor Faci-Poirl Unit 3 and 4 lities with an OL or CP 79-26 Breach of Containment 11/5/79 All Power Reactor Facilities Integrity with an 0; or CP 79-12A Attempted Damage to New 11/9/79 All Fuel Facilities, Research Fuel Assemblies Reactors and Power Reactors with an OL or CP 79-27 Steam Generator Tube 11/16/79 All Power Reactor Facilities Ruptures at Two PWR with an OL or CP Facilities 1518 036