ML19260A894

From kanterella
Jump to navigation Jump to search
Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Specific Action or Response Required
ML19260A894
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/09/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Clayton F
ALABAMA POWER CO.
References
NUDOCS 7912060097
Download: ML19260A894 (2)


Text

~-

$a atog' 8(,

o UNITED STATES g

g NUCLEAR REGULATORY COMMISSION 3

E REGION ll 8

101 MARIETTA ST., N.W., SUITE 3100

.....,d*

ATLANTA, GEORGIA 30303 In Reply Refer To:

RII:JPO 50-348 50-364 Alab.ima Power Company Attn:

F. L. Clayton, Jr.

Senior Vice President Post Office Box 2641 Birmingham, Alabama 35291 Gentlemen:

This Information Notice is provided to inform licensees of a possible signifi-cant matter.

It is expected that recipients will conrider dissemination of the information to all persons working at their licensed facilities.

No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have any questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely, wm'

~

D, James P. O'Reilly Director

Enclosures:

1.

IE Information Notice No.79-12A 2.

List of IE Information Notices losued in Last 6 Months 1510 079 791208o o97

Alabamt Power Company 6 cc w/ enc 1:

A. R. Barton Executive Vice President Post Office Box 2641 Birmingham, Alabama 35291 J. T. Young Vice President-Production Post Office Box 2641 Birmingham, Alabama 35291 C. Biddinger, Jr.

Manager-Corporate Quality Assurance

. Post Office Box 2641 Birmingham, Alabama 35291 H. O. Thrash Manager-Nuclear Generation Post Office Box 2641 Birmingham, Alabama 35291 H. G. Hairston, III Plant Manager Drawer 470 Ashford, Alabama 36312 R. E. Hollands, Jr.

QA Supervisor Post Office Box U Ashford, Alabama 36312 1510 080

SSINS No.:

6300 UNITED STATES Accession No.:

NUCLEAR REGULATORY COMMISSION 7910250490 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 D) c, k

November 9, 1979 e[ j'

a IE Information Notice No.79-12A ATTEMPTED DAMAGE TO NEW FUEL ASSEMBLIES This notice provides supplemental informatirn concerning the identification and conviction of the persons responsible for the introduction of a possibly damaging substance to the new fuel stored at the Virginia Electric and Power Company's Surry Power Station in Surry County, Virginia.

Investigation of this incident by the FBI culminated in the surrender of William E.

Kuykendall and James A. Merrill, Jr., both VEPC0 employees at that time, to Surry County authorities on June 19, 979.

A Grand jury hearing was held in Surry, Virginia on July 24, 1979. The certified charges of breaking and entering with intent to damage electrical facilities (felony), and willful destruction of utility company equipment (felony) were returned on a true bill for trial. An earlier charge for willful damage (mis-demeanor) which had not been certified to the grand jury was reapplied, certified and returned on a true bill for trial. Two additional chargas against both men were introduced for conspiracy regarding the two felonies and returned on a true bill for a total of four felonies and one misdemeanor against each man.

Trial commenced on October 10, 1979 in the Circuit Court, Surry County, Virginia.

The presiding judge ruled that the prosecution failed to supply sufficient evidence to support the charges of conspiracy, breaking and entering, and damage to pro-perty as a misdemeanor. The primary reason for dropping the charges was that the subjects had been authorized unescorted access to Vital Areas by VEPCO. On October 17, 1979, the jury returned a verdict of guilty (both Kuykendall and Merrill) for violation of Virginia Code 18.2-162 (Intentional damage to a facility which furnishes electric service to the public) and set punishment as two (2) years in the State Penitentiary for both subjects, the minimum sentence provided by law.

This Information Notice is provided to inform licensees of a possibly significant matter.

It is expected that recipients will consider dissemination of the information to all persons working at their licensed facilities.

If you have questions regarding this matter, please contact the Director of the appropriate

~

NRC Regional Office.

No written response to this Information Notice is required.

1510 08i

IE Information Notice No.79-12A Enclosure November 9, 1979 Page 1 of 2 LISTING OF IE INFORMATION NOTICES ISSUED IN LAST SIX M0hTHS Information Subject Date Issued To Notice No.

Issued 79-26 Breach of Containment 11/5/79 All power reactor Integrity facilities holding OLs and cps

~79-25 Reactor Trips at Turkey 10/1/79 All power reactor Point Units 3 and 4 facilities holding OLs and cps 79-24 Overpressurization of 10/1/79 All power reactor Containment of a PWR facilities holding Plant After a Main Steam OLs and cps Line Break 79-23 Emergency Diesel Generator 9/26/79 All Holders of cps Lube Oil Coolers and OLs 79-22 Qualification of Control 9/17/79 All Holders of cps Systems 9/14/79 All Holders of OLs 79-21 Transportation and Commer-9/11/79 All Licensees as Supple-cial Burial of Radioactive mental Information to Materials IE Bulletin Nos. 79-19

& 79-20 79-20 NRC Enforcement Policy 9/7/79 All Holders of Reactor (Rev. 1)

NRC Licensed Individuals OLs and cps and Production Licensees with Licensed Operators 79-20 NRC Enforcement Policy 8/14/79 All Holders of Reactor NRC Licensed Indiv.i.sals OLs and cps and Production Licensees with Licensed Operators 79-19 Pipe Cracks in Stagnant 7/18/79 All Holders of Reactor (Correction - Borated Water Systems at OLs and cps Enclosure)

PWR Plants 79-19 Pipe Cracks In Stagnant 7/17/79 All Holders of Reactor Borated Water Systems At DLs and cps PWR Plants 79-18 Skylab Reentry 7/6/79 All Holders of Reactor OLs 1510 082

9 IE Information Notice No.79-12A Enclosure November 9, 1979 Page 2 of 2 LISTING OF INFORMATION NOTICES ISSUED IN LAST SIX MONTHS Information Subject Date Issued To Notice No.

Issued 79-1.7 Source Holder Assembly Damage 6/20/79 All Holders of Reactor Damage From Misfit Between OLs and cps Assembly and Reactor Upper Grid Plate 16 Nuclear Ireident at Three 6/22/79 All Research Reactors Mile Islar.d and Test Reactors with OLs 79-15 Deficient Procedures 6/7/79 All Holders of Reactor OLs and cps 79-14 NRC Position of Electrical 6/11/79 All Power Reactor Cable Support Systems Facilities with a CP 79-12A Attempted Damage to New 11/9/79 All Fuel Facilities, Fuel Assemblies Research Reactors, and OLs and cps 1510 083