ML19260A408

From kanterella
Jump to navigation Jump to search
Forwards LER 79-100/03L-0
Date released: 10/01/2019 Download: ML19260A408


LER 79-100/03L-0:on 791019,monthly Core Flood Tank Boron Analysis Surveillance Not Completed.Caused by Procedure Deficiency in Chemistry Surveillance Schedule.Revision to Surveillance Procedure SP-713 Implemented
ML19260A413
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/08/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260A413 (2)
Forwards LER 79-100/03L-0
ML19260A407
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/15/1979
From: Hancock J
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19260A407 (1)