Forwards IE Insp Repts 50-491/79-17,50-492/79-17 & 50-493/79-17 on 790925-28.No Noncompliance Noted
ML19260A307
Person / Time
Site: Cherokee  Duke Energy icon.png
Issue date: 10/19/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
Shared Package
ML19260A305 List:
References
NUDOCS 7911090290
Download: ML19260A307 (2)


See also: IR 05000491/1979017

Text

/

'o,,

UNITED STATES

h

8

NUCLEAR REGULATORY COMMISSION

,,

g

r

REGION 11

o,

'[

101 MARIETTA ST

N.W.. sulTE 3100

I

          • /

ATLANTA, GEORGIA 30303

OCT 1 S E

In Reply Refer To:

RII:JJL

50-491/79-17

50-492/79-17

50-493/79-17

Duke Power Company

ATTN:

L. C. Dail, Vice President

Design Engineering

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by J. J. Lenahan of this office on

September 25-28, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-167, CPPR-168, and CPPR-169 for the Cherokee Nuclear Station facility, and

to the discussion of our findings held with C. B. Aycock at the conclusion of

the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinaticas of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

1300 345

.

7911 0 90

(;

ge

?

>

Duke Power Company

-2-

OCT 1 s 1979

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

[

of

-

C. E. Murphy, Chief

Reactor Construction and Engineering

Support branch

Enclosure:

Inspection Report Nos. 50-4s1/79-17,

50-492/79-17, and 50-493/79-17

cc w/ enc 1:

J. T. Moore, Project Manager

P. O. Box 422

Gaffney, SC 29340

1300

346