ML19260A307
| ML19260A307 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 10/19/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dail L DUKE POWER CO. |
| Shared Package | |
| ML19260A305 | List: |
| References | |
| NUDOCS 7911090290 | |
| Download: ML19260A307 (2) | |
See also: IR 05000491/1979017
Text
/
'o,,
UNITED STATES
h
8
NUCLEAR REGULATORY COMMISSION
,,
g
r
REGION 11
o,
'[
101 MARIETTA ST
N.W.. sulTE 3100
I
- /
ATLANTA, GEORGIA 30303
OCT 1 S E
In Reply Refer To:
RII:JJL
50-491/79-17
50-492/79-17
50-493/79-17
Duke Power Company
ATTN:
L. C. Dail, Vice President
Design Engineering
P. O. Box 33189
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by J. J. Lenahan of this office on
September 25-28, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-167, CPPR-168, and CPPR-169 for the Cherokee Nuclear Station facility, and
to the discussion of our findings held with C. B. Aycock at the conclusion of
the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinaticas of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
1300 345
.
7911 0 90
(;
ge
?
>
Duke Power Company
-2-
OCT 1 s 1979
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
[
of
-
C. E. Murphy, Chief
Reactor Construction and Engineering
Support branch
Enclosure:
Inspection Report Nos. 50-4s1/79-17,
50-492/79-17, and 50-493/79-17
cc w/ enc 1:
J. T. Moore, Project Manager
P. O. Box 422
Gaffney, SC 29340
1300
346