ML19260A224
| ML19260A224 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/27/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W FLORIDA POWER CORP. |
| Shared Package | |
| ML19260A225 | List: |
| References | |
| NUDOCS 7911080196 | |
| Download: ML19260A224 (2) | |
See also: IR 05000302/1979040
Text
O
,
/
UNITED STATES
bC 'MM
o
8
NUCLEAR REGULATORY COMMISSION
o
I
g
a
REGION 11
o
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA, GEORGIA 303o3
.....
In Reply Refer To:
SEP 2 71979
RII:DRQ
50-302/79-40
Florida Power Corporation
ATTN:
W. P. Stewart, Director
Nuclear Operations
P. O. Box 14042, Mail Stop C-4
St. Petersburg, FL 33733
Gentlemen:
This refers to the inspection conducted by D. R. Quick of this office on
September 4-7,
1979, of activities authorized by NRC Operating License No.
DPR-72 for the Crystal River facility, and to the discussion of our findings
held with G. P. Beatty, Jr. , at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
1296 076
7911080196
.
.
Florida Power Corporation
-2-
.
SEP 2 71979
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/2. c.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
Inspection Report No. 50-302/79-40
cc w/ encl:
G. P. Beatty, Jr.
Plant Superintendent
P. O. Box 1228
Crystal River, FL 32629
,
e
1296 077
2