ML19260A111

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 720504
ML19260A111
Person / Time
Site: Crane Constellation icon.png
Issue date: 06/02/1972
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19260A104 List:
References
50-289-72-09, 50-289-72-9, NUDOCS 7910290729
Download: ML19260A111 (1)


Text

..- -..

l-ENCLOSURE h O ne cri et = r n==="rer===ce 'ee-Metropolitan Edisen Company Docket No. 50-?f9 License No. CPld-40 5

One item appears to be in nonconformance with Appendix B to 10 CFR 50, as identified below:

I Criterion V, " Instructions, Procedures, and Drauingo", states in part, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, l

procedures, or drawings."

l Contrary to the above, the elevations of the construction joints in the containment ring girder are at considerable i

i variance with Gilbert Associates Drawing 4192-E-421-047.

In addition, there is no evidence that there are concrete keys at each ring girder construction joint as shown on United Engineers and Constructors' Drawing 9459-FS-335.

O e

e 1479 348 s

e*

.anggy

_ ~ -,

- -. -