ML19259D651

From kanterella
Jump to navigation Jump to search
Forwards LER 79-092/03L-0
Date released: 09/30/2019 Download: ML19259D651


LER 79-092/03L-0:on 790925,in Mode 1,Halon Recirculation Fans FSF-1 & FSF-2 Failed to Start During Functional Test. Caused by Faulty Design Which Rendered Motor Overloads Inadequate for Fan Operating Characteristics
ML19259D658
Person / Time
Site: Crystal River 
Issue date: 10/17/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259D658 (2)
Forwards LER 79-092/03L-0
ML19259D650
Person / Time
Site: Crystal River 
Issue date: 10/22/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19259D650 (1)