[D
/
'o
UNITED STATES
.g, - p
g
8
NUCLEAR REGULATORY COMMISSION
yg
o
,
g
a
REGION 11
1o1 MARIETTA ST., N.W., SUITE 310o
.....
,
ATLANTA, GEORGIA 3o3o3
.
InReplyReferTo:f
SEP 141979
RII:DMM
50-321/79-28
'
50-366/79-32
Georgia Power Company
'
Attn:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by D. M. Montgomery of this
office on August 21-25, 1979 of activities authorized by NRC License
Nos. DPR-57 and NPF-5 for the Hatch facility, and to the discussion of
our findings held with T. Greene at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items cf noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do net hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
121.5
110
4
.
7910250
SEP 141979
.
Georgia Power Company
-2-
.
.
Should you have any questions concerning this letter, we will be glad to
discuss them d th you.
.
Sincerely,
,
J. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
Inspection Report Nos. 50-321/79-28
and 50-366/79-32
cc w/ enclosures:
M. Manry, Plant Manager
Post Office Box 442
Baxley, Georgia 31513
C. E. Belflower
Site QA Supervisor
Post Office Box 442
Baxley, Georgia 31513
W. A. Widner
Manager-Nuclear Operations
Georgia Power Company
Post Office Box 4545
Atlanta, Georgia 30303
1213
111
.
.