ML19259D549

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/79-28 & 50-366/79-32 on 790821-25.No Noncompliance Noted
ML19259D549
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/14/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19259D550 List:
References
NUDOCS 7910250067
Download: ML19259D549 (2)


See also: IR 05000321/1979028

Text

[D

/

'o

UNITED STATES

.g, - p

g

8

NUCLEAR REGULATORY COMMISSION

yg

o

,

g

a

REGION 11

1o1 MARIETTA ST., N.W., SUITE 310o

.....

,

ATLANTA, GEORGIA 3o3o3

.

InReplyReferTo:f

SEP 141979

RII:DMM

50-321/79-28

'

50-366/79-32

Georgia Power Company

'

Attn:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by D. M. Montgomery of this

office on August 21-25, 1979 of activities authorized by NRC License

Nos. DPR-57 and NPF-5 for the Hatch facility, and to the discussion of

our findings held with T. Greene at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items cf noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do net hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

121.5

110

4

.

7910250

SEP 141979

.

Georgia Power Company

-2-

.

.

Should you have any questions concerning this letter, we will be glad to

discuss them d th you.

.

Sincerely,

,

J. T. Sutherland, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

Inspection Report Nos. 50-321/79-28

and 50-366/79-32

cc w/ enclosures:

M. Manry, Plant Manager

Post Office Box 442

Baxley, Georgia 31513

C. E. Belflower

Site QA Supervisor

Post Office Box 442

Baxley, Georgia 31513

W. A. Widner

Manager-Nuclear Operations

Georgia Power Company

Post Office Box 4545

Atlanta, Georgia 30303

1213

111

.

.