Forwards IE Insp Repts 50-483/79-05 & 50-486/79-02 on 790430-0501.No Noncompliance Noted
ML19259C752
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 06/25/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19259C753 List:
References
NUDOCS 7908150120
Download: ML19259C752 (2)


See also: IR 05000483/1979005

Text

T

TIC

-

.

[

'4,

UNITED STATES

k

NUCLEAR REGULATORY COMMISSION

f ' -

,

f.

REGloN 111

e

799 ROOSEVELT ROAD

. * at e

.

G LE N E LLY N. IL LINOIS 60137

0 ...*

JUN 2 51979

Docket No. 50-483

Docket No. 50-486

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

P. O.

Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Messrs. E. R. Schweibinz

and W. A. Hansen of this office, Mr. J. C. Mattia of the RI Office

of Inspection and Enforcement and Mr.

C. R. Oberg of the RIV

Office of Inspection and Enforcement on April 30-May 1, 1979, at

the SNCIPS organization office in Cathersburg, Maryland, of acti-

vities related to Callaway Units 1 and 2, as authorized by NRC

Construction Permits No. CPPR-139 and CPPP-140, and to the

discussion of our findings with Mr. PetricA and others of the

SNUPPS organization at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection.

Within these

reas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, wir.hin twenty days of your receipt of this letter,

to

withhold such information from public disclosure.

The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

D 0815gqa

GS&M3

.

..

'

.

.

Union Electric Company

-2-

JU44.5 679

y

We will gladly discuss'any questions you have concerning this

inspection.

Sincerely,

f

$:Jp'bAW

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

i

Enclosure:

IE Inspection Rpt

No. 50-483/79-05 and No.

50-486/79-02

l

cc w/ encl:

W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

!

TIC

Regions I & IV

'

Ms. K. Drey

Hon. C. J. Frass, Chaliman

,

i

l

l

l

.

,

4

l

1

I

i

1

i

,

e