Forwards IE Insp Rept 50-395/79-12 on 790416-19.No Noncompliance Noted
ML19259C455
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 04/27/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19259C454 List:
References
NUDOCS 7906220091
Download: ML19259C455 (2)


See also: IR 05000395/1979012

Text

.

.

e

~

>*"800

UNITED STATES

9

,

[(

jo,,

NUCLEAR REGULATORY COMMISSION

R EGloN il

p

g

101 M ARIETT A STRE ET. N.W.

5

M

3 g

ATLANTA, GEORGI A 30303

o

%...../

APR 2 71979

In Reply Refer To:

RII:TEB

50-395/7912

South Carolina Electric and Gas Company

ATTN:

M. C. Johnson, Vice President

Special Services and Purchasing

P. O. Box 764

Columbia, S C 29218

9

Gentlemen:

,

This refers to the inspection conducted by T. E. Burdette of this office on

April 16-19, 1979, of activities authorized by NRC Construction Permit No.

CPPR-94 for the V. C. Summer Nuclear Station facility, and to the discussion

of our findings held with J. F. Algar at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously reported

unresc1ved items. The status of these items is discussed in the enclosed

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that'you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2281

267

790622007/.4

1

.

.

.

APR 2 71979

f

South Carolina Electric and Gas

-2-

Company

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

[

C . E . Mu rp , , Crie f

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report No. 50-395/79-12

cc w/ enc 1:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, D C 20006

A. A. Smith

Quality Assurance

P. O. Box 8

Jenkinsville, S C 29065

0. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, S C 29065

S. C. Goldbert, Esquire

Office of Executive Legal Director, IE:HQ

~'

2281

268

.