,c& s '/Y
UNITED ST ATES
[/7
pa at009jo
NUCLEAR REGULATORY COMMISSION
,
g
REGION ll
.p , (
g
5
g
101 M ARIETT A STRE ET, N W
f
o
g
'$ ... *
NAR 3 01979
In Reply Reier To:
RII:JKR
50-416/79-04
50-417/79-04
-.
Mississippi Power and Light Company
ATTN:
Mr. Nor ris L. Stampley
Vice President of Product ion
P. O. Box 1640
4ckson, Mississippi 39205
Gentlemeu:
This refers to the inspection conducted by
J. K. Rausch of this office on
March 1-2,
1979, of activities authorized by NRC Construction Permit Nos.
CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Power Plant, l'n i t 1 and 2
facility, and to the dis (ussion of our findings held with J. C. Fuller at the
conclusion of the inspect ion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observat ions by the insocitor.
Within the scope of this inspec t ion, no i t ems o t noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
Ti
status of these items is discussed in the enclosed
report.
In accordance wi t h Sec t i on .' . 790 of the NRC's " Rules of Practice", Part 2,
copy of this letter and the enclosed
Title 10, Code c,f Federal Regulations,
a
inspection report vilI be placed in the NRC's Publit Document Room.
Ii this
report contains any information that you (or your c ont ract or ) believe to be
proprietary, it is necessary that you make a written app l i cat i on wi t hi n
.'O
days to this office to withhold such information from public disclosure
Any
suc h applicat ion must include a full statement of the reasons on the basis of
which it is claimed that the inf ormat ion is proprietary, and should be prepared
so th.+t proprietary information identified in the applic at ion is contained in
a separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
2282
198
7906140649,
,
,
MAR 3 01979
.
Mississippi Power and Light Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
~
~~
(
_
Charles E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Re, ort Nos. 50-416/79-04
and 50-417/79-04
cc w/ encl:
Mr. W.
L. Nail
Plant Superintendent
P
O. Box 756
Port Gibr.on, Mississippi
39150
2282
199