Forwards LER 79-012/01T-0
ML19259C131
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/05/1979
From: Opeka J
NORTHEAST UTILITIES
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19259C132 List:
References
MP-2-4041, NUDOCS 7906120395
Download: ML19259C131 (1)


Text

- .

EllOI2TG3133MIT UTH.3Tl3335 I

W =hhfkhh= = = = c S"""" " "

June 5,1979 MP-2-4041 fir. Boyce H. Grier Director, Region I Office of Inspection and Enforcement U. S. fluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License flo. DPR-65 Docket flo. 50-336 Reportable 0,ccurrence R0-50-336/79-12/1T-0

Dear Mr. Grier,

This letter forwards Licensee Event Report 79-12/lT-0 required to be submitted within fourteen days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.8.b., operation of a systen when a parameter subject to a limiting condition for operation is less conservative than the least conservative aspect of the limiting condition for operation established in the technical specifications. An additional three copics of the report are enclosed.

Yours truly,

, Mb 4.

J. F. Opeka Station Superintendent flillstone Nuclear Power Station JF0/ RAS /11m

Attachment:

LER 79-12/lT-0 2284 116-cc: Director, Office of Inspection and Enforcement, Washington, D.C.(40)

Director, Office of Management Infonnation and Program Control, Washington,D.C.(3)

()6 h 3 l-906120 $Rf