ML19259B660

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/78-31 on 781211-14 & Notice of Violation
ML19259B660
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/19/1979
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19259B650 List:
References
NUDOCS 7903130513
Download: ML19259B660 (2)


See also: IR 05000302/1978031

Text

.

.

MCo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

Jg

,

REGloN il

w

g

101 M ARIETTA STREET.N.W.

5

-

  • - t

8

AT LANT A, CEoRGI A 30303

f

%* . . . . . p

JAN 191979

In Reply Refer To:

RII:DRQ

50-302/78-31

Florida Power Corporation

ATTN:

Mr. W. P. Stewart, Director

Power Production

Post Office Box 14042, Mail Stop C-4

St. Petersburg, Flcrida 33733

Gentlemen:

This refers to the inspection conducted by Mr. D. R. Quick of this

office on December 11-14, 1978 of activities authorized by NRC License

No. DPR-72 for the Crystal River, Unit 3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty at the conclusion of the

inspection.

Areas examaed during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters and unresolved items. The status of these

items is discussed in the enclosed report.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements. This item

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice", Part .2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contrac-

tor) believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any Such application must include a full state-

ment of the reasons on the basis of which it is claimed that the informa-

tion is proprietary, and should be preptred so that proprietary informaMon

7903130513

.

-

..

JAh 1 & 1979

.

Florida Power Corporation

-2-

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

,ET. c7

--a,

. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/78-31

cc w/ enclosures:

Mr. G. P. Beatty, Jr.

Nuclear Plant Superintendent

Post Office Box 1228

Crystal River, Florida 32629

.