ML19259B621

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/78-09 & 50-509/78-09 on 781206-21 & Notice of Violation
ML19259B621
Person / Time
Site: Satsop
Issue date: 01/16/1979
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Strand N
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19259B618 List:
References
NUDOCS 7903130454
Download: ML19259B621 (2)


See also: IR 05000508/1978009

Text

-

. ypp

.

.

..

cd

(4

UNITED STATES

h

>&

NUCLEAR REGULATORY COMMISSION

f,

f

, h

REGION V

s ')$

O

$

SUITE 202, W ALNUT CREEK PLAZA

Y

'

,o'

1990 N. C ALIFORNIA DOULEVARD

g

4e***

WALNUT CREEK, C ALIFOR NI A 94596

JAN 151979

Docket Nos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 468

Richland, Washington 99352

Attention: Mr. ft. O. Strand

Managing Director

Gentlemen:

Subject: flRC Inspection of WilP-3 and WMP-5

This refers to the inspection conducted by regional based inspectors

during December 6-21, 1978, of activities authorized by flRC Construc-

tion Pennit flos. CPPR-154 and 155, and to the discussion of our findings

held with Mr. W. J. Talbott and other members of your staff at the con-

clusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection cor isted of

selective examinations of procedures and representative r .ords,

interviews with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of

your activities was not conducted in full compliance with the NRC

requirements, as set forth in the Notice of Violation, enclosed

herewith as Appendix A.

This item of noncompliance has been cate-

gorized into a level as described in our correspondence to all ?!RC

licensees dated December 31, 1974.

This notice is sent to you pursuant to the provisions of Section 2.201

of the flRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office,

7903130 M

'

.

.

..

Washington Public Power Supply System

-2-

JMJ 1 c. PM

within thirty (30) days of your receipt of this notice, a written

statement or explanation in reply including:

(1)correctivesteps

which have been taken by you and the results achieved; (2) corrective

steps which will be taken to avoid further violations; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the flRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the fiRC's Public

Document Room.

If this report contains any information that you be-

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 30 days of the date of this letter,

requesting that such information be withheld from public disclosure.

The application must include a full statement of the reasons why it

is c1 =1med that the information is proprietary. The application

shoule be prepared so that any proprietary information identified is

contai ed in an enclosure to the application, since the application

withou the enclosure will also be placed in the Public Document Room.

'

If we da not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

vch

G. S. Spencer, Chief

Reactor Construction and

Enoineering Support Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

IE Inspection Report

-

Nos. 50-508/78-09

50-509/78-09

cc w/o enclosure 2:

M. E. Witherspoon, Division Manager

Quality Assurance, WPPSS

W. J. Talbott, Division Manager, HPPSS