Text
s.
UNITED STATES
(g>* 884
NUCLEAR REGULATORY COMMISSION
'
o,,
REGloN il
o
'
0
- -
.$
101 M ARIETT A STREET, N.W.
8
ATLANT A. GEORGI A 30303
o
% ,,,,,*
JAN 151979
In Reply Refer To:
RII:RVL
50-366/78-52
Georgia Power Company
ATTN:
Mr. J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street, N.W.
Atlanta, Georgia 30303
Gentlemen:
This refers to the inspection conducted by Mr. R. Vogt-Lowell of this
office on December 19-22, 1978 of activities authorized by NRC License
No. NPF-5 for the E. I. Hatch, Unit 2 facility, and to the discussion of
our findings held with Mr. M. Hanry at the conclitsion of the inspection.
Attas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and voservations by the inspectors.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information f rom public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary unformation identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
>.
79030103So
.
.
Georgia Power Company
-2-
JAh 1 5 G79
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
NYfGl
'
-
F. J. Long, Chief
Reactor Operations and
Nuclear Support Branch
Enclosure:
Inspection Report 50-366/78-52
cc w/ enclosure:
Mr. M. Manry, Plant Manager
Plant E. I. Hatch
Fost Office Box 442
Baxley, Geargia 31513
Mr. C. E. Belflower
Site QA Supervisor
Plant E. I. Hatch
Post Office Box 442