ML19259B514

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-366/78-52 on 781219-22.No Noncompliance Noted
ML19259B514
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/15/1979
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19259B515 List:
References
NUDOCS 7903010350
Download: ML19259B514 (2)


See also: IR 05000366/1978052

Text

s.

UNITED STATES

(g>* 884

NUCLEAR REGULATORY COMMISSION

'

o,,

REGloN il

o

'

0

- -

.$

101 M ARIETT A STREET, N.W.

8

ATLANT A. GEORGI A 30303

o

% ,,,,,*

JAN 151979

In Reply Refer To:

RII:RVL

50-366/78-52

Georgia Power Company

ATTN:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. R. Vogt-Lowell of this

office on December 19-22, 1978 of activities authorized by NRC License

No. NPF-5 for the E. I. Hatch, Unit 2 facility, and to the discussion of

our findings held with Mr. M. Hanry at the conclitsion of the inspection.

Attas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and voservations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information f rom public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary unformation identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

>.

79030103So

.

.

Georgia Power Company

-2-

JAh 1 5 G79

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

NYfGl

'

-

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

Inspection Report 50-366/78-52

cc w/ enclosure:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

Fost Office Box 442

Baxley, Geargia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. Hatch

Post Office Box 442

Baxley, Georgia 31513

,

>.