UNITED STATES
M
[ em RIGoq(o,
,
,
NUCLEAR REGULATORY COMMISSION
gij
,
{
j y, (
g
REGloN 11
- --
c
101 M ARIETT A STREET, N.W.
IIII
f
'
% .'.v [/
ATLANTA, GEORGIA 30303
o
DEC 2 91978
...
In Reply Refer To:
RII:JRll
50-566/78-10
50-567/78-10
Tennessee Valley Authority
Attn:
Mr. N. B. Hughes
Manager of Power
830 Power Building
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by Mr. J. R. Harris of this
office on December 12-15, 1978 of activities authorized by NRC License
Nos. CPPR-172 and CPPR-173 for the Yellow Creek, Units 1 and 2 facilities,
and to the discussion of our findings held with Mr. M. M. Price at the
conclusion of the inspection.
Areas examined du-ing the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncomplia m were
disclosed.
Two new unresolved items resulted from this inspection and are discussed
in the enclosed report. These items will be examined during subsequent
inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information thtt p: (or
your contractor) believe to be proprietary, it is necessary th-. you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared to
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
7 9 0 2 0 9 0 c2 M
,
.
.
DEC 2 91978
Tennessee Valley Authority
-2
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
b
Charle
E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
E _losures:
Inspection Report Nos. 50-566/78-10
and 50-567/78-10
cc w/ enclosures:
Mr. J. F. Cox
400 Ccmmerce Street
W9D214
Knoxville, Tennessee 37902
Mr. M. M. Price, Project Manager
Yellow Creek Nuclear Plant
Post Office Box 2000
luka, Mississippi
38852