ML19259A643

From kanterella
Jump to navigation Jump to search
Requests Addl Info on Proposed Reactor Coolant Pump Power Monitor.Requests That Info Be Submitted within 30 Days
ML19259A643
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/22/1978
From: Reid R
Office of Nuclear Reactor Regulation
To: Stewart W
FLORIDA POWER CORP.
References
NUDOCS 7901080365
Download: ML19259A643 (3)


Text

,

UNITE D STATES

,,. /

g

1 NUCLEAR REGULATORY COMMISSION

' 's jg,h 3 ' [M l WASHINGTON, D. C. 20555

~

' %,)

a, p.

4

%;.,,. /

' - 6J December 22, 1978 Docket No. 50-302 Mr. W. P. Stewart Director, Power Production Florida Power Corporation P. O. Box 14042, Mail Stop C-4 St. Petersburg, Florida 33733

Dear Mr. Stewart:

We have reviewed your November 29, 1978 letter regarding your proposed Reactor Coolant Pump Power Monitor and have determined that the additional infom.ation identified in the enclosure is necessary to continue our review. You are requested to provide this information within 30 days from the date of this letter.

Sincerely, 4

9 m.

n% % % D. uM(4 jQ Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors Enclosu.e:

Request for Additional Information cc w/ enclosure: See next page 7901080 % f

Florida Power Corporation cc:

Mr. S. A. Brandimore Vice President and General Counsel P. O. Box 14042 St. Petersburg, Florida 33733 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 420, 7735 Old Georgetown Road Bethesda, Maryland 20014 Crystal River Public Library Crystal River, Florida 32629

REQUEST FOR ADDITIONAL INFORMATION CRYSTAL RIVER UNIT NO. 3 1.

Your submittal does not adequately identify the design bases and criteria, safety guides and IEEE standards te be implemented in the design of this modification to the reactor prctection system. You are requested to address this issue.

2.

The " fail safe" characteristic of the current and potential transformers is not an acceptable alternative to seismic and environmental qualification of these components in the reactor safety system. Therefore you are requested to reconsider this aspect of your design and report what qualifications these transformers will have.

. -.