Text
f"'%'o'^
,
4
UNITED STATES
E"
NUCLEAR REGULATORY COMMISSION
n
3
E
REGION lli
'
0
I
799 ROOSEVELT ROAD
o
GLEN E LLYN, ILLINOIS 60137
.....
DLc 191979
Docket No. 50-341
The Detroit Edison Company
ATTN:
Mr. Edward Hines, Assistant
Vice President and Manager
Quality Assurance
2000 Second Avenue
Detroit, MI 48226
Gentlemen:
-
This refers to the inspection conducted by Messrs. F. J. Jablonski and
J. Hughes of this office on November 27-29, 1979, of activities at Enrico
Fermi Nuclear Station, Unit 2, authorized by NRC Construction Permit No.
CPPR-87 and to the discussion of our findings with you and others of your
staff at the conclusion of the inspection.
'
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and inter-
views with personnel.
During this inspection, certain of your activities appeared to be in noncom-
pliance with NRC requirements, as described in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the
NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office within thirty days of your
receipt of this notice a written statement or explanation in reply, including
for each item of noncompliance: (1) corrective action taken and the results
achieved; (2) corrective action to be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
In addition to the need for corrective action regarding the specific item of
noncompliance described in Appendix A, please include in your reply those
actions taken by you to assure that other components described in Section 3.11
of your Final Safety Analysis Report (FSAR), IE Circular 78-08 and IE Bulletin 79-01 have not been likewise unreviewed by your design organization.
1927
076
80 0 2 0G 0 OC) 9
.
DEC 191979
Detroit Edison Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writir.g to this
office, within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a full state-
ment of the reasons for which the information is considered proprietary, and
should be prepared so that proprietary information identified in the application
is contained in an enclosure to the application.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
f
w
Gaston Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice
of Violati'on
2.
IE Inspection Report
No. 50-341/79-24
cc w/encls:
Central Files
Reproduction Unit NRC 20b
Local PDR
Ronnald Callen, Michigan Public
Service Commission
Eugene B. Thomas, Jr., Attorney
1927
077