ML19257D729

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-341/79-24 on 791127-29 & Notice of Violation
ML19257D729
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/19/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Hines E
DETROIT EDISON CO.
Shared Package
ML19257D730 List:
References
NUDOCS 8002060004
Download: ML19257D729 (2)


See also: IR 05000341/1979024

Text

f"'%'o'^

TIC

,

4

UNITED STATES

E"

NUCLEAR REGULATORY COMMISSION

n

3

E

REGION lli

'

0

I

799 ROOSEVELT ROAD

o

GLEN E LLYN, ILLINOIS 60137

.....

DLc 191979

Docket No. 50-341

The Detroit Edison Company

ATTN:

Mr. Edward Hines, Assistant

Vice President and Manager

Quality Assurance

2000 Second Avenue

Detroit, MI 48226

Gentlemen:

-

This refers to the inspection conducted by Messrs. F. J. Jablonski and

J. Hughes of this office on November 27-29, 1979, of activities at Enrico

Fermi Nuclear Station, Unit 2, authorized by NRC Construction Permit No.

CPPR-87 and to the discussion of our findings with you and others of your

staff at the conclusion of the inspection.

'

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office within thirty days of your

receipt of this notice a written statement or explanation in reply, including

for each item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In addition to the need for corrective action regarding the specific item of

noncompliance described in Appendix A, please include in your reply those

actions taken by you to assure that other components described in Section 3.11

of your Final Safety Analysis Report (FSAR), IE Circular 78-08 and IE Bulletin 79-01 have not been likewise unreviewed by your design organization.

1927

076

80 0 2 0G 0 OC) 9

.

DEC 191979

Detroit Edison Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writir.g to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full state-

ment of the reasons for which the information is considered proprietary, and

should be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

f

w

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violati'on

2.

IE Inspection Report

No. 50-341/79-24

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronnald Callen, Michigan Public

Service Commission

Eugene B. Thomas, Jr., Attorney

1927

077