Forwards IE Insp Repts 50-321/79-35 & 50-366/79-39 on 791006-1109.No Noncompliance Noted
ML19257D177
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/07/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19257D178 List:
References
NUDOCS 8002010492
Download: ML19257D177 (2)


See also: IR 05000321/1979035

Text

_

-

fD

o

UNITED STATES

.)O 'M

[' g ~g

NUCLEAR REGULATORY COMMISSION

8(,/

g

,c

REGION 11

o

101 MARIETTA ST

N.W.. SulTE 3100

f

g*****o

ATLANTA. GEORGIA 30303

In Reply Refer To:

g 0113B

RII:RFR

50-321/79-35

59-366/79-39

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. F. Rogers of this office on

October 6 through November 9, 1979, of activities authorized by NRC Operating

License Nos. DPR-57 and NPF-5 for the Hatch facility, and to the discussion of

our findings held with M. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) oelieve to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

.

them with you.

Sincerely,

/ _ p/

l

/s(

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

1855 064

80t)2010 N b

Georgia Power Company

-2-

DEC 41 E

Enclosure:

Inspection Report Nos. 50-321/79-35

and 50-366/79-39

cc w/ encl:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. 0: Box 442

Baxley, GA 31513

W. A. Widner, General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

,

Atlanta, Georgia 30303

..

6