Text
_
-
fD
o
UNITED STATES
.)O 'M
[' g ~g
NUCLEAR REGULATORY COMMISSION
8(,/
g
,c
REGION 11
o
101 MARIETTA ST
N.W.. SulTE 3100
f
g*****o
ATLANTA. GEORGIA 30303
In Reply Refer To:
g 0113B
RII:RFR
50-321/79-35
59-366/79-39
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on
October 6 through November 9, 1979, of activities authorized by NRC Operating
License Nos. DPR-57 and NPF-5 for the Hatch facility, and to the discussion of
our findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) oelieve to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
.
them with you.
Sincerely,
/ _ p/
l
/s(
R. C. Lewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
See Page 2
1855 064
80t)2010 N b
Georgia Power Company
-2-
DEC 41 E
Enclosure:
Inspection Report Nos. 50-321/79-35
and 50-366/79-39
cc w/ encl:
M. Manry, Plant Manager
P. O. Box 442
Baxley, GA 31513
C. E. Belflower
Site QA Supervisor