ML19257C127

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/79-12 & 50-441/79-12 on 791127-29.No Noncompliance Noted
ML19257C127
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/17/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19257C128 List:
References
NUDOCS 8001250009
Download: ML19257C127 (2)


See also: IR 05000440/1979012

Text

'o

UNITED STATES

T.

  • '"

8 ' g([ g

NUCLEAR REGULATORY COMMISSION

REGION lli

e

g

j:p

g

799 ROOSEVELT ROAD

o*

d

% ** (#

b

GLEN ELLYN, ILLINolS 60137

o

L G ' " lE73

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Dalwyn R. Davidson

Vice President-System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Mr. E. W. K. Lee of this

office on November 27-29, 1979, of activities at the Perry Nuclear Plant

Project, Units 1 and 2, authorized by NRC Construction Permits No.

CPPR-148 and No. CPPR-149 and to the discussion of our findings with

Mr. M. Edelman, Mr. G. W. Groscup and others of your staff at the con-

clusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

\\s\\o \\\\S

800125o

.

The Cleveland Electric

-2-

NC 1

U3

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

! $ [ M crz.4 f f ~

~ Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Rpts

No. 50-440/79-12 and No.

50-441/79-12

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio

Power Siting Commission

Mr. Daniel D. Wilt

Attorney

1810

116