Text
I
-
-
E(jeatof,
UNITED STATES
j ) # / [ ,g -
NUCLEAR REGULATORY COMMISSION
3 67/ L j
REGION I
0, A' D
,o#
KING OF PRUSSIA, PENNSYLVANIA 19406
&
631 PARK AVEfeUE
%,
Docket No. 50-322
DEC 2 61979
Long Island Lighting Company
ATTN: Mr. Andrew W. Wofford
Vice President
175 East Old Country Road
Hicksville, New York 11801
Gentlemen:
Subject:
Inspection 50-322/79-07
This refers to your letter dated September 27, 1979, in response to our
letter dated August 21, 1979.
The corrective and preventive actions with respect to Noncompliances No.
I and III which are documented in your letter will be examined during a
subsequent inspection of your program.
Your " General Comment" with respect to Apparent Noncompliance No. II states,
in part "... Regulatory Guide 1.75...also allcws for alternative methods of
compliance. The basic separation criteria are not waived or changed but
remain a plant design basis. Therefore, no change to the FSAR is required."
During a telephone discussion on October 5, 1979, we were informed by a
member of your staff that an analysis of the safety implications of the
destruction of electrical systems in various zones of the facility is in
progress and will be submitted to the Office of Nuclear Reactor Regulation.
We do not agree that the basic separation criteria are unchanged nor that
there is no change to the FSAR.
Paragraph C.6 of Regulatory Guide 1.75 states,
in part " Analyses performed...should be submitted as part of the Safety Analyses
Report..." Therefore, failure to complete the analysis and submit ".t to the
Office of Nuclear Reactor Regulation is considered to be a failure to promptly
correct a nonconforming condition as required by 10 CFR 50, Appendix B,
Criterion 16.
Should you have any further questions concerning this matter, we will be
pleased to discuss them with you.
Your cooperation with us is appreciated.
1796 027
e
i,
'L'
!
R. T. Carlson, Chief
M eactor Construction and
Engineering Support Branch
300124o 3'/3
-
&
9
.
Long Island Lighting Company
-2-
cc:
J. P. Novarro, Project Manager
Edward M. Barrett, Esquire
Edward J. Walsh, Esquire
T. F. Gerecke, Manager, Engineering
QA Department
.
1796 028