ML19257C047

From kanterella
Jump to navigation Jump to search
Forwards Interim Deficiency Rept Re Use of Invalid Seismic Amplified Response Spectra.Deficiency Reported During 791106 Telcon.Final Rept Will Be Submitted by 800601
ML19257C047
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/06/1979
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19257C046 List:
References
SBN-106, NUDOCS 8001240024
Download: ML19257C047 (1)


Text

'.-

L 18 IIPUBLIC SERVICE Compemrof New Mempehre SEABROOK STATION Engineering Office:

20 Turnpike Road Westborough, MA 01581 December 6, 1979 SBN-106 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commisssion Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

Reference:

1.

Docket No. 50-443 and 50-444 2.

Telecon of 11/ 6/79 between J. Mattia NRC and John DeVincentis YAEC

Subject:

10 CFR 50.55 (e) Interim Report on Use of Invalid Seismic Amplified Response Spectra

Dear Sir:

The enclosed interim report is submitted in accordance with the requirements of 10 CFR 50.55 (e).

The final report will be submitted to your office by 6/1/80. This deficiency was reported to the Region I Inspection and Enforcement office, by telephone, on 11/ 6/79.

Very truly yours, M

g John DeVincentis Project Manager JDV:tla Enclosure cc: Director of Inspection & Enforcement U.S. NRC, Washington, D.C.

1797 049 I

8001240

.