l

  1. p* *%q'o

gSMS

"

UNITED STATES

g/f

g

8

NUCLEAR REGULATORY COMMISSION

o

'

$

E

REGION 11

.;#

o

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 3o3o3

NOV 3 01979

In Reply Refer To:

RII:CRM

50-413/79-20

50-414/79-20

-

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, N C 28242

Gentlemen:

This refers to the inspection conducted by C. R. McFarland of this office on

October 30 - November 2, 1979, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility, and to the dis-

cussion of our findings held with S. W. Dressler at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information iuentified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard withir.

the specified period, the report will be placed in the Public Document Room.

1770

352

800118035'S

.

Duke Power Company

-2-

NOV 3 c,1979

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy ,

16

x

Reactor Construction an Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-413/79-20

and 50-414/79-20

cc w/ enc 1:

D. G. Beam, Project Manager

P. O. Box 223

Clover, S C 27910

1770