Forwards IE Insp Repts 50-329/79-26 & 50-330/79-26 on 790805-0928 & Notice of Violation
ML19257B763
Person / Time
Site: Midland
Issue date: 12/13/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19257B764 List:
References
NUDOCS 8001180280
Download: ML19257B763 (2)


See also: IR 05000329/1979026

Text

'

o arg#'o,

UNITED STATES

'

,n

NUCLEAR REGUL ATORY COMMISSION

e

)

$

j.- [E

REGION 111

4

%,

799 ROOSEVELT ROAD

\\

e"

GLEN ELLYN,ILLINolS 60137

p

. . . ,

3

.

Docket No. 50-329

Docket No. 50-330

Consumers Power Company

ATTN:

Mr. Stephen H. Howell

Vice President

1945 Went Parnall Road

Jackson, MI 49201

Gentlemen:

This refers to the inspection conducted by Mr. R. J. Cook of this office

on August 5-31, September 4 and 24-28, 1979, of activities at Midland

Nuclear Power Plant construction site authorized by NRC Construction

Permits No. CPPR-81 and No. CPPR-82 and to the discussion of our findings

with Mr. Corley and other of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and inter-

views with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as described in the enclosed Appendix A.

The

inspection showed that action had been taken to correct the identified non-

compliance and to prevent recurrence.

Consequently, no reply to this noncom-

pliance is required and we have no further questions regarding this matter at

this time.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full state-

ment of the reasons for which the information is considered propr'etary, and

should be prepared so that proprietary information identified in che application

is contained in an enclosure to the application.

1770 098

8001180 AD

.

Consumers Po er Company

-2-

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

e ~ss

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-329/79-26 and

No. 50-330/79-26

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Ronald Callen, Michigan Public

Service Commission

Dr. Wayne E. North

Myron E. Cherry, Chicago

1770 099