e
p nro
o
UNITED STATES
g,gg
,
8
g/g
NUCLEAR REGULATORY COMMISSION
g
6
g
.m
REGION ll
0,,
[
101 MARIETTA ST., N.W.. SulTE 3100
% ***/ p
ATLANTA, GEORGIA 30303
NOV 2 31979
In Reply Refer To:
RII:TEB
50-395/79-36
South Carolina Electric and Gas Company
ATTN:
M. C. Johnson, Vice President
Special Services and Purchasing
P. O. Box 764
Columbia, S C 29218
Gentlemen:
This refers tv the inspection conducted by T. E. Burdette of this office on
November 5-8, 1979, of activities authorized by NRC Construction Permit
No.'CPPR-94 for the V. C. Summer facility, and to the discussion of our findings
held with J. F. Algar at the conclusion of the inspection.
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
1770 090
2h
8001180
1
.
NOV 2 31979
South Carolina Electric and
-2-
Gas Company
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Mu phy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report No. 50-395/79-36
cc w/ enc 1:
T. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N. W.
Washington, D C 20006
A. A. Smith
Quality Assurance
P. O. Box 8
Jenkinsville, S C 29065
0. S. Bradham, Manager
Nuclear Operations
P. O. Box 8
Jenkinsville, S C 29065
1770 09I
~