Forwards IE Insp Repts 50-416/79-30 & 50-417/79-28 on 791114-16.No Noncompliance Noted
ML19257B633
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 11/30/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19257B634 List:
References
NUDOCS 8001180018
Download: ML19257B633 (2)


See also: IR 05000416/1979030

Text

{{#Wiki_filter:.

  1. ,

m'o,, g,cc UNITED STATES 8 NUCLEAR REGULATORY COMMISSION M7 ~ o . $ E REGION II %*****[[ o, 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 NOV 3 01979 In Reply Refer To: RII:JKR 50-416/79-30 50-417/79-28 Mississippi Power and Light Company ATTN: N. L. Stampley Vice President of Production P. O. Box 1640 Jackson, MS 39205 Gentlemen: This refers to the inspection conducted by J. K. Rausch of this office on November 14-16, 1979, of activities authorized by NRC Construction Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Power Plant facility, and to the discussion of our findings held with C. L. Stuart at the conclusion of the

inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. Within the scope of this inspection, no items of noncompliance were disclosed. In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprieta ry, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. Should you have any questions concerning this letter, we will be glad to discuss them with you. Sincerely, 1767 343 g4 C. E. Murphy, Chie Reactor Construction and Engineering Support Branch Enclosure: See Page 2 e oc118e DW

.

Mississippi Power and Light Company -2- NOV 3 01979 Enclosure: Inspection Report Nos. 50-416/79-30 and 50-417/79-28 cc w/ encl: C. K. McCoy, Plant Manager P. O. Box 756 Port Gibson, MS 39150 . 1767 344 }}