Forwards Listed Documents Re Pressurizer Transient,Safety Valve & Spray Valve Requirements,Radwaste Disposal,Power Operated Relief Valve Discharge Piping,Rcs Pressure Levels, Safety Valves & Preventive Maint.W/O Encl
ML19257B615
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/04/1979
From: Haynes R
NRC - NRC THREE MILE ISLAND TASK FORCE
To: Steele M
NRC - NRC THREE MILE ISLAND TASK FORCE
References
TASK-TF, TASK-TMR NUDOCS 8001170786
Download: ML19257B615 (3)


Text

.

f$pa atog

  • o UNITED STATES

'g y

g NUCLEAR REGULATORY COMMISSION C

WASHINGTON, D. C. 20555 5*

ss,*****/

DEC 4 1979 MEMORANDUM FOR: Myrna Steele, NRC Special Inquiry Group FROM:

R. C. Haynes, NRC Special Inquiry Group

SUBJECT:

DOCUMENT RECL'S Enclosed is one copy of the following documents which were obtained by J. P. Durr of the SIG.

Please enter these documents into the SIG System and notify George Frampton of their receipt.

c. A, R. C. Hayn ask Leader 4 NRC/TMI Special Inquiry Group Enclosure Listing of Documents bbb 80011707((

,p

ENCLOSURE 1.

Babcock and Wilcox memorandum, dated March 3,1967, subject: Pressurizer Transient Requirements.

2.

Babcock and Wilcox memorandum, dated September 14, 1967, subject: Pressurizer Safety Valve Requirements.

3.

Babcock and Wilcox memorandun, dated June 22, 1967, subject: Pressurizer Safety Valves.

4.

Babcock und Wilcox memorandum, dated February 13, 1968, s ubj ect : Pressurizer Safety Valve and Spray Valve Requirements.

5.

Burns and Roe letter to GPU Service Corporation, dated June 4,1975, serial number 2550-GP.

6.

Dresser Industries letter to the NRC Special Inquiry Group, dated November 2, 1979, with enclosure.

7.

Burns and Roe, Inc., drawing number 2403, Revision 20, Radwaste Disposal Reactor Building.

8.

Burns and Roe letter to the NRC Special Inquiry Group in response to a request for information.

9.

Dresser Industries letter to the NRC Special Inquiry Group, subject:

Dresser Industries PORV Model 31533VX-30, dated November 16, 1979.

10.

Babcock and Wilcox memorandum, dated April 22, 1979, subject: PORV Discharge Piping.

11.

Fbtropolitan Edison Company, Figure 1, Reactor Coolant System Pressure and Pressurizer Level Versus Time After Turbine Trip.

12.

LER Output on Safety / Relief Valves from 1969 to the Present, Outpuc Sorted by Facility and Event Date.

13.

Babcock and Wilcox Site Problem Report No. 107.

14.

Babcock and Wilcox Field Change Authorization 04-2257-00.

15.

Babcock and Wilcox letter to Manager, Generation Operations-Nuclear, dated July 30, 1975, s ubject:

Preventative Maintenance Suggestions for the RC-RV2 Pressurizer Electromatic Relief Valve.

hb

e 16.

Preventative Maintenance Job Index-by Component, Met-Ed TMI 2, dated September 20, 1979.

17.

Babcock and Wilcox Site Problem Report No. 183, Revision 0.

18.

Quarterly System and Component Failure Listing, Nuclear Plant Reliability Data System, Valves, October 16, 1979.

1916 345