ML19257A338

From kanterella
Jump to navigation Jump to search
Forwards ROs 79-157/01T-0 & 79-158/01T-0
Date released: 09/28/2019 Download: ML19257A338


RO 79-158/01T-0:during Review Required by IE Circular 78-08, S&W Discovered Pressure Differential Switches PDS-HV1228A & B Not Seismically Qualified.Cause Unknown.Problem Being Reviewed
ML19257A345
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/12/1979
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19257A345 (2)
RO 79-157/01T-0:during Review of Seismic Analyses Per IE Bulletin 79-14,nonconformance in Pipe Support Design Was Discovered by S&W.Caused by Incorrect Valve Weights Used in Support Calculations
ML19257A343
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/12/1979
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
References
Download: ML19257A343 (1)
Forwards ROs 79-157/01T-0 & 79-158/01T-0
ML19257A337
Person / Time
Site: North Anna Dominion icon.png
Issue date: 12/12/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: WEBSTER T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257A337 (1)