OEC 10 GB MEMORANDUM FOR:
R. Reid, Chief, Operating Reactors Branch f4, D0R FROM:
G. Lainas, Chief, Plant Systems Branch, 00R
SUBJECT:
FIRE PROTECTION REVIEW - THREE MILE ISLAND, UNIT 1 Facility: Three Mile Island, Unit 1 Docket No.:
50-289 Licensee: Metropolitan Edison Company Responsible Branch: ORB #4 Project Manager:
D. Dilanni Reviewing Branch: Plant Systems Status of Review: SER !ssued; Evaluation of incomplete items is on-going Our evaluation of the licensee's.ubmittals listed in Enclosure 1 is compl ete. The results of our evaluation _are attached (Enclosures 2, 3 and 4). presents our evaluation of issues that are complete. presents our evaluation of issues for which we need additional infonnation and indicates the infonnation required. presents our evaluation for which the licensee's proposals are unacceptable and indicates requirements that would resolve the issue.
It is requested that a meeting be arranged with the licensee within 30 days to resolve outstanding issues identified in Enclosures 3 and 4.
Current status of the SER supplement items is sumarized in Enclosure 1.
s b,q O d y G. Lainas, Chief Plant Systems Branc' Division of Operating Reactors
Enclosures:
As stated 1668 215 cc: See page 2 5
8001080 bd6
. DEC 101979
Contact:
T. Lee X-27878 cc w/ enclosures:
D. Eisenhut W. Gamill S. Hanauer V. Benaroya R. Ferguson P. Matthews D. Dilanni T. Wambach T. Lee R. Hall (BNL)
E. MacDougall (BNL)
J. Klevan (Consultant) 1668 216
~
ENCLOSURE 1 Three Mile Island, Unit 1 - Fire Protection SER Supolement List of Submittal and Status of the Associated Issues SER Section Subject Issue Submittal Status 3.1.1 Fire Detectors 3/16/79 (GQL 0393),
I 5/18/79 (GQL 0681.)
3.1. 3 Auto. Water Spray System Not received 3.1. 4 Auto. Sprinkler or Cable Coating 9/29/78 (GQL 1585)
R 3.1.9 Fire Barrier Penetrations 6/12/78 (GQL 1068)
I 3.1.10 Thermal Insulation of Valves 8/27/79 (GQL 1004)
C 3.1.11 Fire Barriers at Reactor Bldg.
Emergency Cooling Valves 8/27/79 (GQL 1097)
R 3.1.13 RC Pump Lube Oil Collection System 8/27/79 (GQL 1004)
I 3.1.21 Alternate Shutdown Capability Not Received
- 3. 2.1' Protection of Emergency FW Pumps 12/28/79 (GQL 2070)
R 3.2.2 Cable Separation 7/13/79 (GQL 0893),
9/14/79 (GQL 1164)
R 3.2.3 Effect of Water Spray 12/28/78 (GQL 2070)
I 3.2.4 Adequacy of Detector System Design 7/11/79 (GQL 0885)
I 3.2.5 Fire Protection Inside Reactor Bldg.
10/5/78 (GQL 1593)
I 3 2.6 Unlabeled Fire Doors 9/29/78 (GQL 1585),
R 12/1/78 (GQL 1919),
3.1. 8 6/7/79 (GQL 0713) 3.2.7 Alarm Circuit Supervision 12/28/78 (GQL 2070)
C 3.2.8 Remote Shutdown Stations 12/28/78 (GQL 2070)
C 3.2.9 Transient Combustible Study 11/1/78 (GQL 1791)
R 1668 217
SER Station Suoject Issue Submittal Status 3.2.10 Control Bldg. HVAC Loss 12/28/78 (GQL 0842)
C 3.2.11 Interior Hose Station Standpipes Less Than 4" Diameter 7/5/79 (GQL 0842)
C 3.2.12 Emergency Lighting 12/28/78 (GQL 2070)
R 3.2.13 Protection of Relay Room 10/31/78 (GQL 1783)
R 3.2.14 Fire Door Supervision 11/1/78 (GQL 1792)
I 3.2.15 Engineered Safeguard Cabinets 9/29/78 (GQL 1566)
I 1668 218 C - Completed I - Incomplete R - Requirement