ML19257A128

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/79-31,50-270/79-29 & 50-287/79-31 on 791001-1031.No Noncompliance Noted
ML19257A128
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/21/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19257A129 List:
References
NUDOCS 8001020132
Download: ML19257A128 (2)


See also: IR 05000269/1979031

Text

b

.

/

UNITED STATES

!

'n

NUCLEAR REGULATORY COMMISSION

8N

$

,E

REGION ll

M7

o,

j

101 MARIETTA ST., N.W., SUITE 3100

g

ATLANTA, GEORGIA 30303

NOV 211979

In Reply Refer To:

RII:FJ

50-269/79-31

50-270/79-29

50-287/79-31

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by F. Jape of this office on October 1-31,

1979, of activities authorized by NRC Operating License Nos. DPR-38, DPR-47 and

,

DPR-55 for the Oconee Nuclear Station facility, and to the discussion of our

findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

1665

305

h

0o102n \\ 3&

0

.

NOV 21 ;g79

Duke Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

S.C.

R. C.

ewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

Inspection Report Nos. 50-269/79-31,

50-270/79-29 and 50-287/79-31

cc w/ encl:

J. E. Smith, Station Manager

P. O. Box 1175

Seneca, SC 29678

cc w/ encl:

W. Landau, IE:HQ

.

1665

306

.