Advises That NRC Review of IE Bulletin 79-14 Response & Request for Extension Until 800105 Complete.Remaining Insps to Be Completed During 800105 Shutdown & Rept of Final Results Will Be Submitted within 30 Days of Completion
ML19257A061
Person / Time
Site: Pilgrim
Issue date: 12/04/1979
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
References
IEB-79-14, NUDOCS 8001020025
Download: ML19257A061 (1)


Text

YM UNITED STATES gn nrgb NUCLEAR REGULATORY COMMiss!ON o

  • k)x(?o

$5 REGION l j

631 PARK AVENUE 5,f p,

KING OF PRUSSI A, PENNSYLVANIA 19406 w,

DEC 0 4 1979 Docket No. 50-293 Boston Edison Company M/C Nuclear ATTN: Mr. G. Carl Andognini, Manager Nuclear Operations Department 800 Boylston Street Boston, Massachusetts 02199 Gentlemen:

NRC review of your Bulletin 79-14 response and request for an extension until January 5, 1980, dated November 2, 1979, has been completed.

Based on a telephone conversation between Mr. Baunack of this office and Mr. Machon of your staff on dovember 19, 1979, we understand that the following will be accomplished:

a.

Your facility will be shutdown by January 5, 1980, and during the outage the remaining inspections required by Bulletin 79-14 will be completed.

b.

A report will be submitted with the final results of the inspection within 30 days of the completion of the outage.

c.

If the seismic qualification of any safety system piping or component is shown to be improper, the plant will be placed in the cold shutdown condition either within 7 days of identification of any such uncorrected item or as specified in Technical Specifications, whichever is less.

d.

Should such a shutdown (item c. above) occur, the facility will remain in the cold shutdown condition until corrective action on the identified component is completed.

If our understanding of your planned actions described above is not in accordance with your actual plans and actions being implemented, please contact this office by telephone or in writing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of this letter.

Sincerely, Boy e H. Grier Director J. McGuire, Pilgrim Station Manager