ML19256G138

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Page 15.2.3-2 Reflecting Mod to Tech Spec Change Request 60.Provides Addl Operating Margin Between Proposed Primary Sys Pressure & Low Pressurizer Reactor Trip Setpoint
ML19256G138
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/21/1979
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML19256G130 List:
References
NUDOCS 7912270499
Download: ML19256G138 (1)


Text

.

(3)~ Low pressurizer pressure -~ ~ ~ ~ ~

t 1865 psig for operation at 2250 psia primary system pressure L 1790 psig for operation at 2000 psia primary system pressure

.(4) Overtemperature AT _ _ __

1aTo [K1 - K2(T-T') (

+K3 (P-P') - f(aI)]

where ATo = indicated AT at rated power, *F T

= average temperature, *F T'

= 574.2 *F P

= pressurizer pressure, psig P'

= 2235 psig K) 1 1.117 for operation at 2250 psia primary system pressure 1 1.30 for operation at 2000 psia primary system pressure K2 = 0.0150 K3 = 0.000791

= 25 see t)

= 3 sec t2 and f(aI) is an even function of the indicated difference between top and bottom detect 7rs of the power-range nuclear ion chambers; with gains to '..e selected based on measured instrument response during plant startup tests, where qt and q are the precent power in the top and bottom halves of the b

core respectively, and qt + 9b is total core power in percent of rated power, such that:

(a) for qt -9 w

n-

, +9 percent, f(aI) = 0.

b (b) for each percent that the magnitude of qt - 9b exceeds +9 percent the AT trip set point shall be automatically reduced by an equivalent of two percent of rated power.

~

1654 074 15.2.3-2 7912270

_,