ML19256F663
| ML19256F663 | |
| Person / Time | |
|---|---|
| Site: | 07001100 |
| Issue date: | 09/25/1979 |
| From: | Martin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lichtenberger H ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| Shared Package | |
| ML19256F661 | List: |
| References | |
| NUDOCS 7912190775 | |
| Download: ML19256F663 (2) | |
Text
f UNITED STATES p ngng o
NUCLEAR REGULATORY COMMisslON y
n REGION I 5
631 PARK AVENUE s****7,,'f KING OF PRUS$1 A, PENNSYLVANIA 19406
/
SEP 25 M Docket No. 70-1100 Combustion Engineering, Inc.
ATTN:
Mr. H. V. Lichtenberger Vice President - Nuclear Fuel Nuclear Power Systems - Manufacturing P. O. Box 500 Windsor, Connecticut 06095 Gentlemen:
Subject:
Inspection 70-1100/79-06 This refers to the inspection conducted by Mr. D. Holody of this office on July 24-26, 1979, of activities authorized by NRC License No. SNM-1067, and to the discussions of our findings held by Mr. Holody with yourself at the conclusion of the inspection, and to subsequent telephone discussions between Mr. G. Kersteen of your staff and Mr. Holody on August 6, 1979 and August 10, 1979.
Areas examined during this inspection are described in the Office of Inspection and Enforcement Inspection Report which is enclosed with this letter.
Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you had taken to correct the Item of Noncompliance brought to your attention in a letter dated January 17, 1979.
We have no further questions regarding your action at this time.
Based on the results of this inspection, it appears that one of your activities was not conducted in full compliance with NRC requirements, as set forth in the Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been categorized into the levels as described in our correspondence to you dated December 31, 1974.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within twenty (20) days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
1627 354 7912190
Combustion Engineering, 2
SEp 2 51979 Incorporated In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, documentation of findings of your control and accounting procedures for safeguarding special nuclear materials and your facility security procedures are exempt from disclosure; therefore, the enclosures to this letter, and your response to this letter will not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/-
Y Walter G. Martin, Chief Safeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation (Contains 2.790 Info) 2.
Office of Inspection and Enforcement Inspection Report Number 70-1100/79-06 (Contains 2.790 Info)
~
1627 355