ML19256F665

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100/79-06 on 790724-26.Noncompliance Noted: Limit of Error Calculations for Receipts of U Dioxide Powder & Shipments of Finished Fuel Failed to Include Proper Error Rate.Details Withheld (Ref 10CFR2.790)
ML19256F665
Person / Time
Site: 07001100
Issue date: 09/13/1979
From: Holody D, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19256F661 List:
References
70-1100-79-06, 70-1100-79-6, NUDOCS 7912190781
Download: ML19256F665 (1)


Text

-

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION I Report No.

79-06 Docket No.

70-1100 License No.

SNM-1067 Safeguards Group 3

Licensee:

Combustion Engineering, Incorporated P. O. Box 500 Windsor, Connecticut 06095 Facility Name:

Nuclear Power Systems - Manufacturing Inspection At:

Windsor, Connecticut Inspection Conducted:

July 24-26, 1979 Date of Last Material Control and Accounting Inspection:

July 10-12, 1979 Type of Inspection:

Unannounced Material Control and Accounting Inspectors:

1

/o

[N f-/5-77 D. J. Holody, Mat)(pmatical Statistician date date date M

9-/3-79 Approved by:

e 9

date

{.H.(J9ned, Chief,NuclearMaterialControl SuppYrt Section, Safeguards Branch Inspection Summary:

Areas Inspected:

Measurement and Statistical Controls, Inventory Difference (ID) and its associated limit of error (LEID).

The inspection involved 23 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results:

The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspertion except for the following item:

1.

Limit of error calculations, for receipts of U0, powder and shipments of finished fuel, failed to include consideration bf the appropriate errors associated with the measurement systems utilized.

Region I Form 166 1627 356 (August 1979)

^A s 3

-