Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEAR3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 3F0598-07, Monthly Operating Rept for Apr 1998 for Crystal River Unit 31998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Crystal River Unit 3 3F0498-07, Monthly Operating Rept for Mar 1998 for Crystal River,Unit 31998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Crystal River,Unit 3 3F0398-05, Monthly Operating Rept for Feb 1998 for Crystal River, Unit 31998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Crystal River, Unit 3 3F0298-06, Monthly Operating Rept for Jan 1998 for Crystal River,Unit 31998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Crystal River,Unit 3 3F0198-05, Monthly Operating Rept for Dec 1997 for Crystal River,Unit 31997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Crystal River,Unit 3 3F1297-02, Monthly Operating Rept for Nov 1997 for Crystal River,Unit 31997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Crystal River,Unit 3 3F1197-02, Monthly Operating Rept for Oct 1997 for Crystal River, Unit 31997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Crystal River, Unit 3 3F1097-03, Monthly Operating Rept for Sept 1997 for Crystal River,Unit 31997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Crystal River,Unit 3 3F0997-08, Monthly Operating Rept for Aug 1997 for Crystal River1997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Crystal River 3F0897-04, Monthly Operating Rept for Jul 1997 for Crystal River Unit 31997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Crystal River Unit 3 3F0797-01, Monthly Operating Rept for June 1997 for Crystal River Unit 31997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Crystal River Unit 3 3F0697-01, Monthly Operating Rept for May 1997 for Crystal River 31997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Crystal River 3 3F0597-02, Monthly Operating Rept for Apr 1997 for Crystal River Unit 31997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Crystal River Unit 3 3F0497-01, Monthly Operating Rept for Mar 1997 for Crystal River Unit 31997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Crystal River Unit 3 3F0397-07, Monthly Operating Rept for Feb 1997 for Crystal River Unit 31997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Crystal River Unit 3 3F0297-08, Monthly Operating Rept for Jan 1997 for Crystal River Unit 31997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Crystal River Unit 3 3F0197-08, Monthly Operating Rept for Dec 1996 for Crystal River Unit 31996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Crystal River Unit 3 3F1296-03, Monthly Operating Rept for Nov 1996 for Crystal River Unit 31996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Crystal River Unit 3 3F1196-08, Monthly Operating Rept for Oct 1996 for Crngp1996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Crngp 3F1096-03, Monthly Operating Rept for Sept 1996 for Crystal River Unit 31996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Crystal River Unit 3 ML20117N5101996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Crystal River Unit 3 3F0896-01, Monthly Operating Rept for Jul 1996 for Crystal River Unit 31996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Crystal River Unit 3 3F0796-01, Monthly Operating Rept for June 1996 for Crystal River Unit 31996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Crystal River Unit 3 3F0696-02, Monthly Operating Rept for May 1996 for Crystal River Unit 31996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Crystal River Unit 3 3F0596-08, Monthly Operating Rept for Apr 1996 for Crystal River Unit 31996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Crystal River Unit 3 3F0496-12, Monthly Operating Rept for Mar 1996 for Crystal River,Unit 31996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Crystal River,Unit 3 3F0396-06, Monthly Operating Rept for Feb 1996 for Crystal River Unit 31996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Crystal River Unit 3 3F0296-14, Monthly Operating Rept for Jan 1996 for Crystal River Unit 31996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Crystal River Unit 3 3F0196-05, Monthly Operating Rept for Dec 1995 for Crystal River Unit 31995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Crystal River Unit 3 3F1295-02, Monthly Operating Rept for Nov 1995 for Crystal River Unit 31995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Crystal River Unit 3 3F1195-02, Monthly Operating Rept for Oct 1995 for Crystal River Unit 31995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Crystal River Unit 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G0191999-10-15015 October 1999 Safety Evaluation Concluding That Licensee Followed Analytical Methods Provided in GL 90-05.Grants Relief Until Next Refueling Outage,Scheduled to Start on 991001.Temporary non-Code Repair Must Then Be Replaced with Code Repair 3F1099-19, Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated1999-10-13013 October 1999 Part 21 Rept Re Damage on safety-grade Cable Provided to FPC by Bicc Brand-Rex Co.Damage Was Created During Cabling Process While Combining Three Conducters.Corrective Action Program Precursor Card PC99-2868 Was Initiated ML20217B0931999-10-0606 October 1999 Part 21 Rept Re Damaged Safety Grade Electrical Cabling Found in Supply on 990831.Damage Created During Cabling Process While Combining Three Conductors Just Prior to Closing.Vendor Notified of Reporting of Issue ML20212L0881999-10-0404 October 1999 SER Accepting Licensee Requests for Relief 98-012 to 98-018 Related to Implementation of Subsections IWE & Iwl of ASME Section XI for Containment Insp for Crystal River Unit 3 ML20212J8631999-10-0101 October 1999 Safety Evaluation Supporting Licensee Proposed Alternatives to Provide Reasonable Assurance of Structural Integrity of Subject Welds & Provide Acceptable Level of Quality & Safety.Relief Granted Per 10CFR50.55a(g)(6)(i) ML20212E9031999-09-30030 September 1999 FPC Crystal River Unit 3 Plant Reference Simulator Four Year Simulator Certification Rept Sept 1995-Sept 1999 3F1099-02, Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Crystal River,Unit 3.With ML20212E6911999-09-21021 September 1999 Safety Evaluation Supporting Proposed EALs Changes for Plant Unit 3.Changes Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 ML20211L1321999-08-31031 August 1999 EAL Basis Document 3F0999-02, Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Crystal River,Unit 3.With ML20212C1501999-08-31031 August 1999 Non-proprietary Version of Rev 0 to Crystal River Unit 3 Enhanced Spent Fuel Storage Engineering Input to LAR Number 239 ML20211B7291999-08-16016 August 1999 Rev 2 to Cycle 11 Colr ML20210P1111999-08-0505 August 1999 SER Accepting Evaluation of Third 10-year Interval Inservice Insp Program Requests for Relief for Plant,Unit 3 ML20210U5341999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Crystal River,Unit 3 ML20209F5601999-07-31031 July 1999 EAL Basis Document, for Jul 1999 3F0799-01, Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Crystal River,Unit 3.With ML20210U5411999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Crystal River,Unit 3 3F0699-07, Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Crystal River,Unit 3.With ML20210U5601999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Crystal River,Unit 3 ML20195C6271999-05-28028 May 1999 Non-proprietary Rev 0 to Addendum to Topical Rept BAW-2346P, CR-3 Plant Specific MSLB Leak Rates ML20196L2031999-05-19019 May 1999 Non-proprietary Rev 0 to BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-04, Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Crystal River Unit 3.With ML20210U5631999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Crystal River,Unit 3 3F0499-04, Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Crystal River Unit 3.With ML20204D9661999-03-31031 March 1999 Non-proprietary Rev 1,Addendum a to BAW-2342, OTSG Repair Roll Qualification Rept 3F0399-04, Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease1999-03-10010 March 1999 Special Rept 99-01:on 990310,discovered Containment Tendons That Required Grease Addition in Excess of Prescribed Limits During Recent Insp Activites.Six Tendons Were Refilled with Appropriate Amount of Grease 3F0399-03, Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Crystal River Unit 3.With ML20203A4381999-02-0303 February 1999 Safety Evaluation Supporting EAL Changes for License DPR-72, Per 10CFR50.47(b)(4) & App E to 10CFR50 ML20206E9891998-12-31031 December 1998 Kissimmee Utility Authority 1998 Annual Rept ML20206E9021998-12-31031 December 1998 Florida Progress Corp 1998 Annual Rept ML20206E9701998-12-31031 December 1998 Ouc 1998 Annual Rept. with Financial Statements from Seminole Electric Cooperative,Inc 3F0199-05, Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Crystal River Unit 3.With ML20206E9261998-12-31031 December 1998 Gainesville Regional Utilities 1998 Annual Rept 3F1298-13, Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Crystal River,Unit 3.With 3F1198-05, Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Crystal River,Unit 3.With ML20155F4071998-10-31031 October 1998 Rev 2 to Pressure/Temp Limits Rept ML20155J2701998-10-28028 October 1998 Second Ten-Year Insp Interval Closeout Summary Rept 3F1098-06, Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Crystal River Unit 3.With ML20206E9461998-09-30030 September 1998 Utilities Commission City of New Smyrna Beach,Fl Comprehensive Annual Financial Rept Sept 30,1998 & 1997 ML20206E9561998-09-30030 September 1998 City of Ocala Comprehensive Annual Financial Rept for Yr Ended 980930 ML20206E9101998-09-30030 September 1998 City of Bushnell Fl Comprehensive Annual Financial Rept for Fiscal Yr Ended 980930 ML20206E9811998-09-30030 September 1998 City of Tallahassee,Fl Comprehensive Annual Financial Rept for Yr Ended 980930 ML20195E3121998-09-30030 September 1998 Comprehensive Annual Financial Rept for City of Leesburg,Fl Fiscal Yr Ended 980930 3F0998-07, Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Crystal River Unit 3.With ML20236W6501998-07-31031 July 1998 Emergency Action Level Basis Document 3F0898-02, Monthly Operating Rept for Jul 1998 for Crystal River,Unit 11998-07-31031 July 1998 Monthly Operating Rept for Jul 1998 for Crystal River,Unit 1 ML20236V8801998-07-30030 July 1998 Control Room Habitability Rept 3F0798-01, Monthly Operating Rept for June 1998 for Crystal River Unit 31998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Crystal River Unit 3 ML20236Q4611998-06-30030 June 1998 SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History 3F0698-02, Monthly Operating Rept for May 1998 for Crystal River Unit 31998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Crystal River Unit 3 1999-09-30
[Table view] |
Text
-
OPFFf, TING DATA FFFORT DOCFET rJO . 50-302 DATE DECEMDER 5 COMPLETED by: M W CULVER TELEPHONE (904) 795-6486
- QE 3 A T ] t_T. S T AIUS l
I tJO T E S I AIT NAnt C R v ST AL PTVER N3 l l
'EFORTING PERIOD 11/1/79 + 11/3II/70
- I I LICEtJCED THE RnAL POWER (MWT) 2452 I I "AME PLATC PnT itG (GPO55 MWE) 000 I I IiE E 10tJ f.LE C T F I C AL P A T I rJG (NET MWE) 825 I I
.M I nU M DEFENDABLE CAPACIT( (GROSS MWE) 835 I I nA/IMUM DEFENDADLE CAPACITY tNET MWE) 707 i !
Ir CHANGET. OCC'IR IN CAPACIT( FATINGS ( ITEh3 NilMBER 3 THROUGH 7) SINCE LAST REFORT, GIVE F E ASON' _ - _ _ _ _ - . _ _ _ _ . _ _ _ _ _ _ _ - - _ _ _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ - - - . _ _ _ - _ _ - - . - _ - _ _ _ _
FOWER I.EVEL TO WHICH RESTRICTED.IF ANY(tJET nWE): NONE PCASONS FOR PESTRICTIONS, IF ANY _-_-._________ .__-__-_-__-._._.__-______-_.___- _--.____
THIS MONTH YR.-TO-DATE CUMULATIVE 11 HOURS Irf RE PORTING PERIOD 720 0016 23032
.. MJ h[ E F Or HOUF5 PEACTOR WA5 CRITICAL 720.0 4561.9 14410.1 K T AC T r.P FTT.FPVE SHUTDOWN HnUPS 0.0 743.5 1116.'
.4, HTK GL 4hATOR . ;N - L. J NE 7 0 . 0 4435.0 1MTo 15- Ut!I T REGERVE SHUTDOWN HOURS 0.0 0.0 0.L 16 GROSS THEPMAL ENERGY GENERATED (MWH) 1726425 13601623 34278771 17 GRO35 ELECTRICAL ENEPGY GENERATED (hWH) 583315 3385639 103S%85
- 13. NEl ELECTRICAL ENEPGY GENERATED (MWH' 555728 3201503 9031568 1 '; UNIT SERVICE FACTOP 100.0 /* 55.3 /+ 58.7 /t IIN I T .W., T L Ab lL I T Y FACTOR 100.0*/* 55.3./. 58.7-/*
. UNI- CAI ..:'i FACIOF (USING hDC NET) C6.0 /* 50.1 /- 51.n- -
. ::Hi
3 l bH T F0r ciD bbiAGE FsiE 0.0 /. 25.7c . 36 . .
24 GHuiDOWrd %rHFDU yE .THE NEDT 6 MONTHS (T F DAT . A D. DURATION Or EACH)
.________.-_ . ce m .-t _. . ....... --------__-____-..___
'y EN D OFtefREPORT _ _ _ .ff.dep.
e-_ - FERIOD. ESTIMATED DATE OF STARTUP: Wreh_m --_- ------ - . ---- -- _ - . _ _ -- - _ - _
25 ;r SHUT DOWN AT .. ---__ __.- - -________
, t, UrJ I T S l tJ TEST STATUS (PRIOR TO COMMEPCIAL OPERATION) FORECAST ACHIEVED INIT!AL LPITICALITY - -_____ 1/14/77 INITIAL ELEETRICITY _ _ - - - . . _ _ 1/30<77 COMnEPCIAL OPERATION ------__ 3/13/77 1608 158 g
m yg mg q
% M u A h, r q912180 /
a, .g. ,__ . ., % .e.e . . . . . . .<
AVER AGE D AILY UNIT POWER LEVEL DOCKET NO. 50-302 UNIT FLCRP-3 DATE 12/10/79 COMPLETED BY M. W. culver TELEPilONE (904)795-6486 MONTil NOVEMBER DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net t (MWe-Net!
790 17 795 2 799 18 795 3 784 in 789 4 793 20 761 5
786 723 21 6 43 2; 771 7 657 23 792 g 784 24 786 g 789 25 790 10 793 26 786
- 786 27 788 12 --
790 28 797 l3 808 29 7AA 34 662 30 774 15 667 3
- i. 792 INSTRUCTIONS On this format. hst the cerage dr v - w ine! m MWe. Net for each day in the reporting month. Compute to the neareu whoie meF'*31 1608 159 ""77' pee p m gyg feeM of JLllnim M
r ee h ll t
, g o n d r
- g s6 r n
i e ntn G eR e eb a o vA s i I 0 l6 nd n t a
h Wd c R 1 7 u i e ed r Rt nF e l l i
2 - f Cba an mae d n na e;
t x l sS l aMd i
ae e n e N 0 P n o ao i w nrh p v e e i 3 R i .7
- r f u hl gc cd e
wb c r . ssh eadTo e l s nt anF el s i e 0 ? ) rc i
t esoit rr ioa ceI 5 F 1 Mn
.A i hd at a l tk h ee . s ak DiR u
o o
( e v
e c
aa n rc i o aaanTnl t yw n swea ol al a tufLE c
r or L S
e n al l oel rt ts nfo I m ti c e od p or o . t rHae noi a O.EEYE e inr ee t edt rf t ul n r r t e I
S N MTBN r u t rr s e einWnli - ta ets oi r ep AA DO ron c ea e ent et roF aoa mrr Gah e i I
E N D Ei l Co i Re ul ow t
uecuad c dd ed e e td ti pS R e )
ti K I T P &t c t d o nr H nlhd n b r tn1 b I F E eAn s s norn i et eor h i P >r e6 u
CN L E L s u
e s
ni o
nk oa ocooWav scS xro tnv1 iN O
D U P a e ciFgeno M . EfEE0 I M T C P r i ; .i e tT xtl i
t l ol n d O ocu; tcu""A dnuScB a kr cieah te C c4b u
d rrdk .d ad yneyrt s 5
eeeead en enb alld u rst reerid ri tll n j na l r e d oaro d rewr irst rl enrie a ed eeaek aeesit t t n wn wbpwacwvuanrai oueoeooearoaea o o "D Pt rPllPl cd c pH g s
a P c" w S .
N O H H H H m) a n r
I C C C C mci a T
C %3U - X E
X E
X E
X E
aSl r p U !S cixc T T T T D R H H H H .l StaE l
E oem h(r E a a R B duu o annt R M ha ut E E g7C C C C H t
e M> M - . A.- O W V E ,,
H H Ml 234 O @ H H O N P
D 1 1
N T A N S O e r s
N M et s t W T n nre o A A A A R e v p / / / / n O i.c F e N N N N o D O 1 R i I P ta U E n l R i
S im a
l x i
N
~hk5 gd A A A A )
F U
Ysg / / / / n e s
)
N N N N ia n in h2j lp e a c lp x ni L x E o E
345 (t
e e r
s ic&
t ig I
r B A A H uT r o) lif tsin r
" a ao e net n F e Ri ai r sI i a 7 5 c yT l a la lp
?8E 7 tnn ea gor rs io1 r
t nx :
35$ 9 2
8 4
5 3 2 mn el pt el a int at o mta (
ninu uifurgemeh i r er o
s qa e e pd pt h* F F F aEMRROA.OO e - - - -
F RABCDliFGIl i
- s a 6 4 0 0 e 0 1 2 3 1 1 1 1 la 1 1 1 1 D 9 9 9 9 d
e ed c e rohc D 2 3 4 5 F S )
2 2 2 2 7
- - - FS 7 N". 9 9 9 9 /
3
_ 7 7 7 7 'l
- O O "CO
. i MONTHLY STATUS REPORT REFUELING INFORMATION REQUESf
- 1. Name of Facility: Crystal River Unit 3
- 2. Scheduled date of next refueling, shutdown: Apri l , 1980.
- 3. Scheduled date for restart following refueling: June, 1980.
- 4. Will refueling or resumption of operation thereafter require a technical sr cification change or other license amendment? Yes. In general, changes to the CR #3 technical specifications will include:
- a. Moderator Temperature Coefficient (3.1.1.3)
- b. Control Rod Insertion Limits (3.1.3.6)
- c. Control Rod Group Assignments (3.1.3.7)
- d. Axial Imbalance Limits (3.2.1)
- e. Refueling Boron Concentration (3.9.1)
These specifications will be reviewed and changed as necessary based on the reactivity of the second cycle as compared to that of the first cycle.
S. Scheduled date(s) for submitting proposed licensing action and supporting information: Februa ry , 1980.
- 6. Impartant licensing considerations associated with refueling, e.g.,
new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in f uel design, or new operating procedures.
Florida Power Corporation is presently discussing with the NRC staf f our intent to request that the power level of CR #3 be raised from the present level of 2452 MW (t) to the ultimate core power level of 2544 MW (t) as described in the CR #3, FSAR. FPC submitted, on February 28, 1979, our reload report justifying Cycle 2 operation of CR #3 at 2544 MW (t). On May 25, 1979, FPC modified its Cycle 2 reload report justifying continued operation of 2452 MW (t). It is our intent to continue our discussions with the NRC in order to obtain the power upgrade at a later date.
- 7. ' The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
. a. 17/ assemblies
- b. 60 assemblies,
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity thr.c has been requested or .
is planned, in number of fuel assemblies. - .
- a. Present storage capacity - Pool A - 120 plus 8 f ailed fuel assemblies.
Pool B - 120 plus 8 failed fuel assemblies.
WPSemhW01 ,
- w. .. . . ,.
. m . ;s a
- 8. (Continued) .
- b. Filed request on January 9,1978 with NRC concerning expansion of Pool A fran 120 to 544 assemblies plus 6 failed fuel assemblies and expansion of Pool B from 120 to 609 assemblies. Expansion of Pool A is to occur at the refueling in April,1980. The Pool B expansion will occur at a Ifter refueling outage (approximately 1986).
Additional detailed design information concernin9 our fuel pool expansion was submitted to the Commission on March 3 and March 28, 1978, January 18, 1979, March 16, 1979, June 29, 1979, September 5, 1979 and October 10, 1979.
- 9. The projected date of the last refuelin9 that can be discharoed to the spent fuel assuming the present licensed capacity. 1981-Ir 1.
1608 162 WPSemhW01 C5
.